-
Product Insights
Tanzania–Uganda Pipeline, Tanzania
Tanzania–Uganda is located in Dar es Salaam, Tanzania. The pipeline is owned by Tanzania Petroleum Development Corp. It will be operated by Tanzania Petroleum Development Corp. The project is currently in the announced stage and is expected to start operations in 2026. Tanzania–Uganda Pipeline profile includes core details such as name, location (start and end points and route points), pipeline type, asset status, start year, owner and equity stakes, operator, length, diameter, design pressure and installed capacity along with relevant...
-
Product Insights
Tanzania Mbolea and Petrochemicals Company Kilwa Complex, Tanzania
Tanzania Mbolea and Petrochemicals Company Kilwa Complex is located in Lindi, Tanzania. The petrochemicals complex is owned by Tanzania Mbolea and Petrochemicals Co Ltd. It will be operated by Tanzania Mbolea and Petrochemicals Co Ltd. The project is currently in the announced stage and is expected to start operations in 2028. Tanzania Mbolea and Petrochemicals Company Kilwa Complex profile includes core details such as complex name, location, complex status, start year, annual petrochemical capacity (mtpa) for the period 2015-2030, key...
-
Product Insights
Songo Songo Field, Tanzania
Songo Songo upstream field is located in Indian Ocean, Tanzania. The upstream field is owned by PanAfrican Energy Tanzania Ltd. It is operated by PanAfrican Energy Tanzania Ltd. The project started its operations in 2004. Songo Songo Upstream Field profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2, sulphur), location, as well as key operational data including production, start and end years, reserves and capital and operating costs....
-
Product Insights
Tazama New Pipeline, Tanzania
Tazama New is located in Dar es Salaam, Tanzania. The pipeline is owned by TAZAMA Pipelines Ltd. It will be operated by TAZAMA Pipelines Ltd. The project is currently in the planned stage and is expected to start operations in 2027. Tazama New Pipeline profile includes core details such as name, location (start and end points and route points), pipeline type, asset status, start year, owner and equity stakes, operator, length, diameter, design pressure and installed capacity along with relevant...
-
Product Insights
Ntorya Upstream Project , Tanzania
Ntorya upstream project is located in Mtwara, Tanzania. The upstream project is owned by ARA Petroleum Tanzania Ltd (50%); Ndovu Resources Ltd (25%); Scirocco Energy Plc (25%). It will be operated by ARA Petroleum Tanzania Ltd. The project is currently in the planned stage and is expected to start operations in 2023. Ntorya Upstream profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2, sulphur), location, as well as...
-
Product Insights
Mnazi Bay Complex Field, Tanzania
Mnazi Bay Complex upstream field is located in Mtwara, Tanzania. The upstream field is owned by Cyprus Mnazi Bay Ltd (16.38%); M&P Exploration and Production Tanzania Ltd (38.22%); Tanzania Petroleum Development Corp (20%); Wentworth Gas Ltd (25.40%). It is operated by M&P Exploration and Production Tanzania Ltd. The project started its operations in 2006. Mnazi Bay Complex Upstream Field profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2,...
-
Product Insights
Chongoleani Liquids Storage Terminal, Tanzania
Chongoleani liquids storage terminal is located in Tanga, Tanzania. The liquids storage terminal is owned by China National Offshore Oil Corp (8%); Tanzania Petroleum Development Corp (15%); TotalEnergies SE (62%); Uganda National Oil Co (15%). It will be operated by Total E&P Uganda BV. The project is currently in the planned stage and is expected to start operations in 2025. Chongoleani Liquids Storage Terminal profile includes details such as name, location, asset status, start year, owner and equity stakes, operator,...
-
Product Insights
Zafarani Complex Upstream Project , Tanzania
Zafarani Complex upstream project is located in Indian Ocean, Tanzania. The upstream project is owned by ExxonMobil Exploration and Production Tanzania Ltd (35%); Statoil Tanzania AS (65%). It will be operated by Statoil Tanzania AS. The project is currently in the announced stage and is expected to start operations in 2029. Zafarani Complex Upstream profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2, sulphur), location, as well as...
-
Product Insights
Block 4 Upstream Project , Tanzania
Block 4 upstream project is located in Indian Ocean, Tanzania. The upstream project is owned by Ophir Tanzania (Block 4) Ltd (20%); Pavilion Energy Corp (20%); Shell Tanzania Ltd (60%). It will be operated by Shell Tanzania Ltd. The project is currently in the announced stage and is expected to start operations in 2029. Block 4 Upstream profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2, sulphur), location,...
-
Product Insights
Block 1 Upstream Project , Tanzania
Block 1 upstream project is located in Indian Ocean, Tanzania. The upstream project is owned by Ophir Tanzania (Block 1) Ltd (20%); Pavilion Energy Corp (20%); Shell Tanzania Ltd (60%). It will be operated by Shell Tanzania Ltd. The project is currently in the announced stage and is expected to start operations in 2029. Block 1 Upstream profile includes core details such as name, resource type, asset status, stage, owner and equity stakes, operator, product specs (gravity, CO2, sulphur), location,...
-
Product Insights
Lindi LNG Liquefaction Terminal, Tanzania
Lindi LNG liquefaction terminal is located in Lindi, Tanzania. The LNG liquefaction terminal is owned by Equinor ASA (12.50%); Exxon Mobil Corp (12.50%); Pavilion Energy Pte Ltd (12.50%); PT Medco Daya Abadi Lestari (20%); Shell plc (30%); Tanzania Petroleum Development Corp (12.50%). It will be operated by Shell plc. The project is currently in the announced stage and is expected to start operations in 2030. Lindi LNG liquefaction terminal profile includes details such as name, location, type, asset status, start...
-
Product Insights
Astra Energy Tanzania CCGT Power Plant
Astra Energy Tanzania CCGT Power Plant profile includes core details such as plant name, technology, capacity, status, plant proponents (owners, developers etc.), owner stakes etc as well as key operational data including generation, year online, decommissioning year, capital expenditure etc. Details on project specific contacts along with relevant news, deals and contracts are also provided through the plant profile. This is an on-demand report that will be delivered upon request. The report will be delivered within 1 business day of...
-
Sector Analysis
Tanzania Construction Market Size, Trend Analysis by Sector, Competitive Landscape and Forecast to 2027
Tanzania Construction Market Report Overview The Tanzania construction market size was $30.6 billion in 2022. The market is projected to achieve an AAGR of more than 7% during 2024-2027, supported by developments in transport, housing, and industrial infrastructure. Tanzania Construction Market Outlook, 2022-2027 For more insights into the Tanzania construction market forecast, download a free report sample The Tanzania construction market research report provides detailed market analysis, information, and insights into the Tanzania construction industry, including the growth prospects of...
-
Sector Analysis
NewSub-Saharan Africa Construction Market Size, Trend Analysis by Sector, Competitive Landscape and Forecast, 2023-2027
Sub-Saharan Africa Construction Market Overview The Sub-Saharan Africa construction industry is expected to be evaluated at $210.4 billion in 2023, growing at a compound annual growth rate (CAGR) of 4.8% over the forecast period. High oil and gas prices and Europe’s shift away from Russian oil and gas continue to present opportunities for the vastly untapped oil and gas market across the region. This will fuel the demand for necessary infrastructure and power-related facilities. The regional energy and utilities sector...
-
Product Insights
MoICS Tanzania – Dodoma Stadium – Dar es Salaam
Equip yourself with the essential tools needed to make informed and profitable decisions with our MoICS Tanzania - Dodoma Stadium - Dar es Salaam report./b> Note: This is an on-demand report that will be delivered upon request. The report will be delivered within 2 business days of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance. Why choose our report? Unleash the full story: Dive deep into...
-
Product Insights
TANROADS – Upgrade of Makongolosi – Mkiwa Road : Lot 7(A): Noranga – Itigi – Tanzania – Singida
Equip yourself with the essential tools needed to make informed and profitable decisions with our TANROADS - Upgrade of Makongolosi - Mkiwa Road : Lot 7(A): Noranga - Itigi - Tanzania - Singida report./b> Note: This is an on-demand report that will be delivered upon request. The report will be delivered within 2 business days of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance. Why choose...
-
Product Insights
MNRT Tanzania – Rehabilitation of Roads for Nyerere National Park – Ruvuma
Equip yourself with the essential tools needed to make informed and profitable decisions with our MNRT Tanzania - Rehabilitation of Roads for Nyerere National Park - Ruvuma report./b> Note: This is an on-demand report that will be delivered upon request. The report will be delivered within 2 business days of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance. Why choose our report? Unleash the full story:...
-
Product Insights
TANROADS – Vikawe – Mapinga Road: Lot 2: Pangani – Mapinga section – Tanzania
Equip yourself with the essential tools needed to make informed and profitable decisions with our TANROADS - Vikawe - Mapinga Road: Lot 2: Pangani - Mapinga section - Tanzania report./b> Note: This is an on-demand report that will be delivered upon request. The report will be delivered within 2 business days of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance. Why choose our report? Unleash the...
-
Product Insights
East African Crude Oil (EACOP) Pipeline, Uganda
East African Crude Oil (EACOP) is located in Western Region, Uganda. The pipeline is owned by China National Offshore Oil Corp (8%); Tanzania Petroleum Development Corp (15%); TotalEnergies SE (62%); Uganda National Oil Co (15%). It will be operated by Total E&P Uganda BV. The project is currently in the planned stage and is expected to start operations in 2025. East African Crude Oil (EACOP) Pipeline profile includes core details such as name, location (start and end points and route...
-
Product Insights
Tanzania AA – Julius Nyerere International Airport: Commercial Complex – Dar es Salaam
Equip yourself with the essential tools needed to make informed and profitable decisions with our Tanzania AA - Julius Nyerere International Airport: Commercial Complex - Dar es Salaam report./b> Note: This is an on-demand report that will be delivered upon request. The report will be delivered within 2 business days of the purchase, excluding weekends and holidays. Certain sections of the report may be removed or altered based on data availability and relevance. Why choose our report? Unleash the full...