Power Market in CARICOM and Associated Countries – Installed Capacity, Capacity Mix, Renewable Roadmap, Electricity Tariffs and Future Outlook to 2030

“Power Market in CARICOM and Associated Countries – Installed Capacity, Capacity Mix, Renewable Roadmap, Electricity Tariffs and Future Outlook to 2030” is the latest market analysis report from GlobalData, the industry analysis specialists that offer comprehensive information and understanding of the power market in the Caribbean Community (CARICOM) and associated countries.

The report provides a clear overview of and detailed insight into the power market in CARICOM and associated countries. The report provides power market scenario and outlook for thirty three countries in the region. Countries include - Antigua and Barbuda, Bahamas, Barbados, Belize, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Suriname, Trinidad and Tobago, Anguilla, Bermuda, British Virgin Islands, Cayman Islands, Turks and Caicos Islands, Aruba, Curaçao, Dominican Republic, Sint Maarten, Panama, Costa Rica, Nicaragua, El Salvador, Honduras, Guatemala, Puerto Rico, Mexico and Colombia. The report covers present power market scenario, electric system, installed capacity trend by power generating source (2006-2030), installed capacity mix, key renewable policies, opportunities and threats in renewable energy deployment.

The report uses data and information sourced from proprietary databases, primary and secondary research, and in-house analysis by GlobalData’s team of industry experts.

Scope

The report analyses power market in CARICOM and associated countries. Its scope includes:

  • Power market insights in CARICOM and for thirty three countries namely - Antigua and Barbuda, Bahamas, Barbados, Belize, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Suriname, Trinidad and Tobago, Anguilla, Bermuda, British Virgin Islands, Cayman Islands, Turks and Caicos Islands, Aruba, Curacao, Dominican Republic, Sint Maarten, Panama, Costa Rica, Nicaragua, El Salvador, Honduras, Guatemala, Puerto Rico, Mexico and Colombia.
  • Details on current electricity system (generation, transmission and distribution) and players in the value chain.
  • Historic information (2006–2018) and forecast (2019–2030) for installed power capacity for the countries.
  • Detailed information about the installed power capacity, segmented by thermal (coal, oil and gas), nuclear and renewable (hydro, solar PV, wind, geothermal, and biopower)
  • Key policies, regulations and incentive schemes supporting the development of renewable energy for every country.
  • Information on future strategy, roadmaps and other programs to achieve the renewable targets and goals.
  • Opportunities, threats and barriers to support the implementation of the renewable energy for individual country.
  • Information on the prevalent power tariffs for countries based on availability of the latest information.

Reasons to buy

The report will allow you to:

  • Facilitate decision-making by providing historical and forecast data in power sector in CARICOM and associated countries
  • Identify opportunities and plan strategies
  • Identify key factors driving investment opportunities in key countries
  • Develop strategies based on latest market and policy developments in the sector
  • Position yourself to gain the maximum advantage of the industry’s growth potential
  • Identify key partners and business-development avenues
  • Respond to your market structure, strategies and prospects

Companies mentioned

Anguilla Electricity Company Limited, Antigua Public Utilities Authority, WEB Aruba, N.V. ELMAR, Barbados Light and Power Company , Bahamas Power and Light , Belize Electricity ...

Anguilla Electricity Company Limited, Antigua Public Utilities Authority, WEB Aruba, N.V. ELMAR, Barbados Light and Power Company , Bahamas Power and Light , Belize Electricity Limited , Bermuda Electric Light Company Limited , British Virgin Islands Electricity Corporation, Caribbean Utilities Company , Emgesa, Public Companies of Medellin, ISAGEN, Gecelca and Pacific Energy Company, National Energy and Light Company, Aqualectra, Dominica Electricity Services , Grenada Electricity Services Limited , Guyana Power & Light Company Inc., Electricity Company of Haiti , Jamaica Public Services Company Ltd , Montserrat Utilities Limited , St Lucia Electricity Services Ltd , St Vincent Electricity Services Ltd. , Fortis TCI, Turks and Caicos Utilities, Trinidad and Tobago Electricity Commission, Trinity Power Limited

Table of Contents

1 Table of Contents

1.1 List of Tables

1.2 List of Figures

2 Executive Summary

2.1 Cumulative Installed Capacity in CARICOM to reach 212.7GW by ...

1 Table of Contents

1.1 List of Tables

1.2 List of Figures

2 Executive Summary

2.1 Cumulative Installed Capacity in CARICOM to reach 212.7GW by 2030

2.2 Thermal is the Major Source of Electricity in the Region

2.3 Shift in Capacity Mix – Renewables to Lead Future Development

2.4 Renewable Energy Targets Supported by Financial Incentives a Key Driver for Renewable Development

3 Introduction

3.1 GlobalData Report Guidance

4 Power Market, CARICOM Countries

4.1 Power Market, CARICOM Countries, Present Scenario

4.1 Power Market, CARICOM Countries, Installed Capacity, 2006–2018

4.1.1 Power Market, CARICOM Countries, Installed Capacity Mix, 2018

4.2 Power Market, CARICOM Countries, Future Outlook

4.2.1 Power Market, CARICOM Countries, Installed Capacity, 2019–2030

4.2.2 Power Market, CARICOM Countries, Installed Capacity Mix, 2018–2030

5 Power Market, Anguilla

5.1 Power Market, Anguilla, Present Scenario

5.2 Power Market, Anguilla, Installed Capacity, 2006–2018

5.2.1 Power Market, Anguilla, Installed Capacity Mix, 2018

5.3 Power Market, Anguilla, Future Outlook

5.3.1 Power Market, Anguilla, Installed Capacity, 2019–2030

5.3.2 Power Market, Anguilla, Installed Capacity Mix, 2018–2030

5.4 Power Market, Anguilla, Renewable Policy and Roadmap

5.4.1 National Energy Policy

5.4.2 Climate Change Plan

5.4.3 Renewable Energy Integration Project

5.4.4 Training to initiate a National Energy Efficiency Strategy

5.4.5 New sustainable energy project

5.5 Opportunities and Threats in Renewable Energy Deployment

5.5.1 Opportunities

5.5.2 Threats

5.6 Power Market, Anguilla, Electricity Tariff by Segment

6 Power Market, Antigua and Barbuda

6.1 Power Market, Antigua and Barbuda, Present Scenario

6.2 Power Market, Antigua and Barbuda, Installed Capacity, 2006–2018

6.2.1 Power Market, Antigua and Barbuda, Installed Capacity Mix, 2018

6.3 Power Market, Antigua and Barbuda, Future Outlook

6.3.1 Power Market, Antigua and Barbuda, Installed Capacity, 2019–2030

6.3.2 Power Market, Antigua and Barbuda, Installed Capacity Mix, 2018–2030

6.3.3 Power Market, Antigua and Barbuda, Goal Vs. Possible Achievement, 2020 & 2030

6.4 Power Market, Antigua and Barbuda, Renewable Policy and Roadmap

6.4.1 National Energy Policy

6.4.2 Renewable Energy Act

6.4.3 Crypto currency to develop renewable energy

6.4.4 Deals & Contracts

6.4.5 Renewable Energy for reconstruction in Antigua & Barbuda

6.5 Opportunities and Threats in Renewable Energy Deployment

6.5.1 Opportunities

6.5.2 Threats

6.6 Power Market, Antigua and Barbuda, Electricity Tariff by Segment

7 Power Market, Aruba

7.1 Power Market, Aruba, Present Scenario

7.2 Power Market, Aruba, Installed Capacity, 2006–2018

7.2.1 Power Market, Aruba, Installed Capacity Mix, 2018

7.3 Power Market, Aruba, Future Outlook

7.3.1 Power Market, Aruba, Installed Capacity, 2019–2030

7.3.2 Power Market, Aruba, Installed Capacity Mix, 2018–2030

7.3.3 Power Market, Aruba, Goal Vs. Possible Achievement

7.4 Power Market, Aruba, Renewable Policy and Roadmap

7.4.1 2020 Vision Green Deck Aruba

7.4.2 RAS (Renewable, Affordable, and Sustainable) Framework

7.4.3 Net Metering

7.4.4 Solar tariffs

7.4.5 Tax Exemption

7.4.6 Wartsila Smart Power Generation plant to support Aruba’s move to renewable energy

7.4.7 K&M Supporting Solar PV Expansion in Aruba

7.4.8 New Solar Project launched in Aruba in 2017

7.5 Opportunities and Threats in Renewable Energy Deployment

7.5.1 Opportunities

7.5.2 Threats

7.6 Power Market, Aruba, Electricity Tariff by Segment

8 Power Market, Barbados

8.1 Power Market, Barbados, Present Scenario

8.2 Power Market, Barbados, Installed Capacity, 2006–2018

8.2.1 Power Market, Barbados, Installed Capacity Mix, 2018

8.3 Power Market, Barbados, Future Outlook

8.3.1 Power Market, Barbados, Installed Capacity, 2019–2030

8.3.2 Power Market, Barbados, Installed Capacity Mix, 2018–2030

8.3.3 Power Market, Barbados, Goal Vs. Possible Achievement

8.4 Power Market, Barbados, Renewable Policy and Roadmap

8.4.1 National Energy Policy, 2019-2030

8.4.2 Barbados National Energy Policy (BNEP), 2017–2037

8.4.3 Climate Change Policy

8.4.4 National Sustainable Energy Policy

8.4.5 The Electric Light and Power Act of 2013

8.4.6 Net Billing Scheme

8.4.7 Tax Credits

8.4.8 Public Sector Smart Energy Program (PSPP)

8.4.9 Funds and Grants

8.4.10 New Solar PV system installed in Barbados

8.5 Opportunities and Threats in Renewable Energy Deployment

8.5.1 Opportunities

8.5.2 Threats

8.6 Power Market, Barbados, Electricity Tariff by Segment

9 Power Market, Bahamas

9.1 Power Market, Bahamas, Present Scenario

9.2 Power Market, Bahamas, Installed Capacity, 2006–2018

9.2.1 Power Market, Bahamas, Installed Capacity Mix, 2018

9.3 Power Market, Bahamas, Future Outlook

9.3.1 Power Market, Bahamas, Installed Capacity, 2019–2030

9.3.2 Power Market, Bahamas, Installed Capacity Mix, 2018–2030

9.3.3 Power Market, Bahamas, Target Vs. Possible Achievement, 2030

9.4 Power Market, Bahamas, Renewable Policy and Roadmap

9.4.1 National Energy Policy, 2013-2033

9.4.2 BPL signs contract with Wartsila for new power plant at Clifton Pier

9.4.3 Integrated Resource Plan (Draft)

9.4.4 Small –scale renewable generation Program (SSRG)

9.4.5 Family Islands Solar Energy Program

9.4.6 Memorandum of Understanding (MoU)

9.4.7 Tenders and Contracts

9.4.8 First Utility-scale PV plant

9.4.9 Carbon War room

9.4.10 Import Duties

9.5 Opportunities and Threats in Renewable Energy Deployment

9.5.1 Opportunities

9.5.2 Threats

9.6 Power Market, Bahamas, Electricity Tariff by Segment

10 Power Market, Belize

10.1 Power Market, Belize, Present Scenario

10.2 Power Market, Belize, Installed Capacity, 2006–2018

10.2.1 Power Market, Belize, Installed Capacity Mix, 2018

10.3 Power Market, Belize, Future Outlook

10.3.1 Power Market, Belize, Installed Capacity, 2019–2030

10.3.2 Power Market, Belize, Installed Capacity Mix, 2018–2030

10.3.3 Power Market, Belize, Target Vs. Possible Achievement, 2030

10.4 Power Market, Belize, Renewable Policy and Roadmap

10.4.1 Horizon 2030

10.4.2 The Electricity Act

10.4.3 National Energy Policy Framework

10.4.4 National Climate Change Policy, Strategy and Action Plan (2015-2020)

10.4.5 Sustainable energy action plan Belize 2014-2030

10.4.6 Growth and Sustainable Development Strategy (GSDS), 2016-2019

10.4.7 National Climate Resilience Investment Plan (NCRIP)

10.4.8 Energy resilience for climate adaptation project (ERCAP)

10.4.9 National Solid Waste Management Policy (NSWMP)

10.4.10 Auctions and Tenders

10.5 Opportunities and Threats in Renewable Energy Deployment

10.5.1 Opportunities

10.5.2 Threats

10.6 Power Market, Belize, Electricity Tariff by Segment

11 Power Market, Bermuda

11.1 Power Market, Bermuda, Present Scenario

11.2 Power Market, Bermuda, Installed Capacity, 2006–2018

11.2.1 Power Market, Bermuda, Installed Capacity Mix, 2018

11.3 Power Market, Bermuda, Future Outlook

11.3.1 Power Market, Bermuda, Installed Capacity, 2019–2030

11.3.2 Power Market, Bermuda, Installed Capacity Mix, 2018–2030

11.3.3 Power Market, Bermuda, Target Vs. Possible Achievement

11.4 Power Market, Bermuda, Renewable Policy and Roadmap

11.4.1 National Electricity Sector Policy

11.4.2 New Integrated Resource Plan (IRP)

11.4.3 New Energy Storage Solution

11.4.4 Solar Energy Rebate Program

11.4.5 Net Metering and Avoided Cost Compensation Scheme

11.4.6 Electricity Act, 2016

11.4.7 Mergers and Acquisitions

11.5 Opportunities and Threats in Renewable Energy Deployment

11.5.1 Opportunities

11.5.2 Threats

11.6 Power Market, Bermuda, Electricity Tariff by Segment

12 Power Market, British Virgin Islands

12.1 Power Market, British Virgin Islands, Present Scenario

12.2 Power Market, British Virgin Islands, Installed Capacity, 2006–2018

12.2.1 Power Market, British Virgin Islands, Installed Capacity Mix, 2018

12.3 Power Market, British Virgin Islands, Future Outlook

12.3.1 Power Market, British Virgin Islands, Installed Capacity, 2019–2030

12.3.2 Power Market, British Virgin Islands, Installed Capacity Mix, 2018–2030

12.3.3 Power Market, British Virgin Islands, Target Vs. Possible Achievement

12.4 Power Market, British Virgin Islands, Renewable Policy and Roadmap

12.4.1 Renewable Energy Program, 2013

12.4.2 Resilient National Energy Transition Strategy

12.4.3 New Renewable Energy Regulations, 2018

12.4.4 Energy Policy

12.4.5 British Virgin Islands Electricity Corporation Act 2015

12.4.6 Energy and Conservation: Education and Awareness Campaign

12.4.7 Climate Change Adaptation Policy

12.4.8 Youth Empowerment Project to go solar

12.5 Opportunities and Threats in Renewable Energy Deployment

12.5.1 Opportunities

12.5.2 Threats

12.6 Power Market, British Virgin Islands, Electricity Tariff by Segment

13 Power Market, Cayman Islands

13.1 Power Market, Cayman Islands, Present Scenario

13.2 Power Market, Cayman Islands, Installed Capacity, 2006–2018

13.2.1 Power Market, Cayman Islands, Installed Capacity Mix, 2018

13.3 Power Market, Cayman Islands, Future Outlook

13.3.1 Power Market, Cayman Islands, Installed Capacity, 2019–2030

13.3.2 Power Market, Cayman Islands, Installed Capacity Mix, 2018–2030

13.3.3 Power Market, Cayman Islands, Target Vs. Possible Achievement

13.4 Power Market, Cayman Islands, Renewable Policy and Roadmap

13.4.1 Acquisition of solar plant in Cayman Islands

13.4.2 National Energy Policy, 2017–2037

13.4.3 CORE Program

13.4.4 Plan for Solar carport in government center

13.4.5 Integrated Resource Plan

13.5 Opportunities and Threats in Renewable Energy Deployment

13.5.1 Opportunities

13.5.2 Threats

13.6 Power Market, Cayman Islands, Electricity Tariff by Segment

14 Power Market, Colombia

14.1 Power Market, Colombia, Present Scenario

14.2 Power Market, Colombia, Installed Capacity, 2006–2018

14.2.1 Power Market, Colombia, Installed Capacity Mix, 2018

14.3 Power Market, Colombia, Future Outlook

14.3.1 Power Market, Colombia, Installed Capacity, 2019–2030

14.3.2 Power Market, Colombia, Installed Capacity Mix, 2018–2030

14.3.3 Power Market, Colombia, Plan Vs. Possible Achievement, 2028

14.4 Power Market, Colombia, Renewable Policy and Roadmap

14.4.1 Auctions

14.4.2 Net Metering - 2018 Resolution CREG 030

14.4.3 Funds Supporting Investment in Energy Projects

14.4.4 Program of Rational and Efficient use of Energy and Other Forms of Non-Conventional Energy

14.4.5 Policy guideline for the Promotion of Sustainable Biofuels Production in Colombia (Conpes 3510)

14.4.6 Law 939 to promote the production and commercialization of biodiesel

14.4.7 Law 1665 (2013)

14.4.8 Law 1715 (2014)

14.4.9 Decree 0570

14.4.10 Decreto 348 del 1 de marzo de 2017

14.4.11 NDC Support Program

14.4.12 Renewable Energy Indicative Action Plan

14.4.13 Electric Coverage Expansion Plan, 2016–2020

14.4.14 National Energy Plan 2050

14.4.15 Generation and Transmission Expansion Plan

14.5 Opportunities and Threats in Renewable Energy Deployment

14.5.1 Opportunities

14.5.2 Threats

14.6 Power Market, Colombia, Electricity Tariff by Segment

15 Power Market, Costa Rica

15.1 Power Market, Costa Rica, Present Scenario

15.2 Power Market, Costa Rica, Installed Capacity, 2006–2018

15.2.1 Power Market, Costa Rica, Installed Capacity Mix, 2018

15.3 Power Market, Costa Rica, Future Outlook

15.3.1 Power Market, Costa Rica, Installed Capacity, 2019–2030

15.3.2 Power Market, Costa Rica, Installed Capacity Mix, 2018–2030

15.3.3 Power Market, Costa Rica, Goal Vs. Possible Achievement, 2021

15.4 Power Market, Costa Rica, Renewable Policy and Roadmap

15.4.1 New Climate Policy and Renewable Energy Goal

15.4.2 National Decarbonisation Plan 2018-2050

15.4.3 Net Metering

15.4.4 Feed-in Tariffs

15.4.5 National Energy Plan, 2015–2030

15.4.6 National Development Plan

15.4.7 Electricity Generation Expansion Plan, 2016–2035

15.4.8 Energy Strategy

15.4.9 Biofuel Regulation

15.4.10 Regulations on the Efficient Use of Energy and tax incentives

15.5 Opportunities and Threats in Renewable Energy Deployment

15.5.1 Opportunities

15.5.2 Threats

15.6 Power Market, Costa Rica, Electricity Tariff by Segment

16 Power Market, Curacao

16.1 Power Market, Curacao, Present Scenario

16.2 Power Market, Curacao, Installed Capacity, 2006–2018

16.2.1 Power Market, Curacao, Installed Capacity Mix, 2018

16.3 Power Market, Curacao, Future Outlook

16.3.1 Power Market, Curacao, Installed Capacity, 2019–2030

16.3.2 Power Market, Curacao, Installed Capacity Mix, 2018–2030

16.3.3 Power Market, Curacao, Goal Vs. Possible Achievement

16.4 Power Market, Curacao, Renewable Policy and Roadmap

16.4.1 National Development Plan, 2015-2030

16.4.2 National Energy Policy 2017

16.4.3 Feed In Tariffs

16.4.4 Tender for Solar Energy Project

16.5 Opportunities and Threats in Renewable Energy Deployment

16.5.1 Opportunities

16.5.2 Threats

16.6 Power Market, Curacao, Electricity Tariff by Segment

17 Power Market, Dominica

17.1 Power Market, Dominica, Present Scenario

17.2 Power Market, Dominica, Installed Capacity, 2006–2018

17.2.1 Power Market, Dominica, Installed Capacity Mix, 2018

17.3 Power Market, Dominica, Future Outlook

17.3.1 Power Market, Dominica, Installed Capacity, 2019–2030

17.3.2 Power Market, Dominica, Installed Capacity Mix, 2018–2030

17.3.3 Power Market, Dominica, Target Vs. Possible Achievement, 2020

17.4 Power Market, Dominica, Renewable Policy and Roadmap

17.4.1 National Resilience Development Strategy 2030

17.4.2 Sustainable and Resilient Energy Plan (S-REP)

17.4.3 Geothermal Risk Mitigation Project

17.4.4 Nanogrid Disaster grid Office

17.4.5 International Solar Alliance

17.4.6 EU signs financing agreement with Dominica

17.4.7 Electricity Law

17.4.8 National Energy Policy

17.4.9 Geothermal Resources Development Bill

17.5 Opportunities and Threats in Renewable Energy Deployment

17.5.1 Opportunities

17.5.2 Threats

17.6 Power Market, Dominica, Electricity Tariff by Segment

18 Power Market, Dominican Republic

18.1 Power Market, Dominican Republic, Present Scenario

18.1.1 Power Market, Dominican Republic, Installed Capacity, 2006–2018

18.1.2 Power Market, Dominican Republic, Installed Capacity Mix, 2018

18.2 Power Market, Dominican Republic, Future Outlook

18.2.1 Power Market, Dominican Republic, Installed Capacity, 2019–2030

18.2.2 Power Market, Dominican Republic, Installed Capacity Mix, 2018–2030

18.2.3 Power Market, Dominican Republic, Target Vs. Possible Achievement, 2025

18.3 Power Market, Dominican Republic, Renewable Policy and Roadmap

18.3.1 General Electricity Law

18.3.2 Renewable Energy Incentive Law

18.3.3 Tax Exemptions

18.3.4 Net Metering

18.3.5 Rural electrification program

18.3.6 Tenders

18.3.7 Renewable Energy Roadmap

18.4 Opportunities and Threats in Renewable Energy Deployment

18.4.1 Opportunities

18.4.2 Threats

18.5 Power Market, Dominican Republic, Electricity Tariff by Segment

19 Power Market, El Salvador

19.1 Power Market, El Salvador, Present Scenario

19.2 Power Market, El Salvador, Installed Capacity, 2006–2018

19.2.1 Power Market, El Salvador, Installed Capacity Mix, 2018

19.3 Power Market, El Salvador, Future Outlook

19.3.1 Power Market, El Salvador, Installed Capacity, 2019–2030

19.3.2 Power Market, El Salvador, Installed Capacity Mix, 2018–2030

19.4 Power Market, El Salvador, Renewable Policy and Roadmap

19.4.1 Renewable Energy Auctions

19.4.2 US Real Infrastructure switches on 44-MW solar portfolio in El Salvador

19.4.3 Loans and Grants

19.4.4 National Energy Policy, 2010-2024

19.4.5 Save Energy El Salvador

19.4.6 National Climate Change Strategy

19.4.7 Fiscal Incentive Law for the Promotion of Renewable Electricity Generation

19.4.8 National Energy Commission Law

19.4.9 General Electricity Law

19.4.10 National Energy Strategy

19.5 Opportunities and Threats in Renewable Energy Deployment

19.5.1 Opportunities

19.5.2 Threats

19.6 Power Market, El Salvador, Electricity Tariff by Segment

20 Power Market, Guatemala

20.1 Power Market, Guatemala, Present Scenario

20.1.1 Power Market, Guatemala, Installed Capacity, 2006–2018

20.1.2 Power Market, Guatemala, Installed Capacity Mix, 2018

20.2 Power Market, Guatemala, Future Outlook

20.2.1 Power Market, Guatemala, Installed Capacity, 2019–2030

20.2.2 Power Market, Guatemala, Installed Capacity Mix, 2018–2030

20.2.3 Power Market, Guatemala, Target Vs. Possible Achievement,2027

20.3 Power Market, Guatemala, Renewable Policy and Roadmap

20.3.1 National Energy Policy 2013–2027

20.3.2 General Law of Electricity

20.3.3 Incentives Law for the Development of Renewable Energy Projects

20.3.4 Auctions

20.3.5 Net Metering

20.3.6 Indicative Plans of Generation and Transportation

20.3.7 National Rural Electrification Policy 2019–2032

20.3.8 Opportunities and Threats in Renewable Energy Deployment

20.4 Power Market, Guatemala, Electricity Tariff by Segment

21 Power Market, Grenada

21.1 Power Market, Grenada, Present Scenario

21.2 Power Market, Grenada, Installed Capacity, 2006–2018

21.2.1 Power Market, Grenada, Installed Capacity Mix, 2018

21.3 Power Market, Grenada, Future Outlook

21.3.1 Power Market, Grenada, Installed Capacity, 2019–2030

21.3.2 Power Market, Grenada, Installed Capacity Mix, 2018–2030

21.3.3 Power Market, Grenada, Goal Vs. Possible Achievement, 2020 & 2030

21.4 Power Market, Grenada, Renewable Policy and Roadmap

21.4.1 Awards and Recognition

21.4.2 National Sustainable Development Plan, 2035

21.4.3 National Energy Policy

21.4.4 GRENLEC’s Customer Renewable Energy Interconnection Programme

21.4.5 Grenada Vision 2030

21.4.6 National Climate Change Adaptation Plan

21.4.7 Net Metering/ Billing

21.4.8 Tax Reduction/Exemptions

21.5 Opportunities and Threats in Renewable Energy Deployment

21.5.1 Opportunities

21.5.2 Threats

21.6 Power Market, Grenada, Electricity Tariff by Segment

22 Power Market, Guyana

22.1 Power Market, Guyana, Present Scenario

22.2 Power Market, Guyana, Installed Capacity, 2006–2018

22.2.1 Power Market, Guyana, Installed Capacity Mix, 2018

22.3 Power Market, Guyana, Future Outlook

22.3.1 Power Market, Guyana, Installed Capacity, 2019–2030

22.3.2 Power Market, Guyana, Installed Capacity Mix, 2018–2030

22.3.3 Power Market, Guyana, Goal Vs. Possible Achievement

22.4 Power Market, Guyana, Renewable Policy and Roadmap

22.4.1 National Energy Policy

22.4.2 Green State Development Strategy: Vision 2040

22.4.3 Low Carbon Development Strategy (LCDS)

22.4.4 The Guyana REDD+ (Reducing emissions from deforestation and forest degradation) Investment Fund (GRIF)

22.4.5 Tax exemption and Incentives

22.4.6 Guyana Energy Agency Act

22.4.7 Hydro Electric Power Act

22.4.8 Arco Norte Electrical Interconnection System

22.4.9 Net Metering

22.5 Opportunities and Threats in Renewable Energy Deployment

22.5.1 Opportunities

22.5.2 Threats

22.6 Power Market, Guyana, Electricity Tariff by Segment

23 Power Market, Haiti

23.1 Power Market, Haiti, Present Scenario

23.1.1 Power Market, Haiti, Installed Capacity, 2006–2018

23.1.2 Power Market, Haiti, Installed Capacity Mix, 2018

23.2 Power Market, Haiti, Future Outlook

23.2.1 Power Market, Haiti, Installed Capacity, 2019–2030

23.2.2 Power Market, Haiti, Installed Capacity Mix, 2018–2030

23.3 Power Market, Haiti, Renewable Policy and Roadmap

23.3.1 Energy Sector Stakeholders

23.3.2 Study on Micro-grids Potential – Town Ranking Report

23.3.3 Call for Pre-qualification of Companies for Increasing Access of Electricity through Mini and Micro-grids by ANARSE

23.3.4 Call for Pre-qualification of Companies for Realization and Reinforcement of Haiti Electricity Network by ANARSE

23.3.5 Tax Incentives

23.3.6 Draft National Energy Policy

23.3.7 Haiti SREP Investment Plan

23.4 Opportunities and Threats in Renewable Energy Deployment

23.4.1 Opportunities

23.4.2 Threats or Barriers

23.5 Power Market, Haiti, Electricity Tariff by Segment

24 Power Market, Honduras

24.1 Power Market, Honduras, Present Scenario

24.1.1 Power Market, Honduras, Installed Capacity, 2006–2018

24.1.2 Power Market, Honduras, Installed Capacity Mix, 2018

24.2 Power Market, Honduras, Future Outlook

24.2.1 Power Market, Honduras, Installed Capacity, 2019–2030

24.2.2 Power Market, Honduras, Installed Capacity Mix, 2018–2030

24.2.3 Power Market, Honduras, Target Vs. Possible Achievement

24.3 Power Market, Honduras, Renewable Policy and Roadmap

24.3.1 National Energy Plan 2010–2022 and National Vision 2010–2038

24.3.2 Law of Electrical Industry

24.3.3 Incentives Law for Renewable Energy Generation

24.3.4 Law on the promotion of Electric Power Generation with Renewable Resources

24.3.5 Feed-in Tariff

24.3.6 Auctions

24.3.7 Honduras Renewable Energy Finance Facility (H-REFF)

24.3.8 Self-Supply Renewable Energy Guarantee Program

24.3.9 Funds and Grants

24.4 Opportunities and Threats in Renewable Energy Deployment

24.5 Power Market, Honduras, Electricity Tariff by Segment

25 Power Market, Jamaica

25.1 Power Market, Jamaica, Present Scenario

25.2 Power Market, Jamaica, Installed Capacity, 2006–2018

25.2.1 Power Market, Jamaica, Installed Capacity Mix, 2018

25.3 Power Market, Jamaica, Future Outlook

25.3.1 Power Market, Jamaica, Installed Capacity, 2019–2030

25.3.2 Power Market, Jamaica, Installed Capacity Mix, 2018–2030

25.3.3 Power Market, Jamaica, Goal vs. Possible Achievement

25.4 Power Market, Jamaica, Renewable Policy and Roadmap

25.4.1 National Energy Policy (2009-2030)

25.4.2 Renewable Energy and Energy Efficiency Department

25.4.3 Tax Exemptions

25.4.4 Sustainable Energy Credit Lines

25.5 Opportunities and Threats in Renewable Energy Deployment

25.5.1 Opportunities

25.5.2 Threats

25.6 Power Market, Jamaican, Electricity Tariff by Segment

26 Power Market, Montserrat

26.1 Power Market, Montserrat, Present Scenario

26.2 Power Market, Montserrat, Installed Capacity, 2006–2018

26.2.1 Power Market, Montserrat, Installed Capacity Mix, 2018

26.3 Power Market, Montserrat, Future Outlook

26.3.1 Power Market, Montserrat, Installed Capacity, 2019–2030

26.3.2 Power Market, Montserrat, Installed Capacity Mix, 2018–2030

26.3.3 Power Market, Montserrat, Target Vs. Possible Achievement, 2020

26.4 Power Market, Montserrat, Renewable Policy and Roadmap

26.4.1 First-utility-scale solar project

26.4.2 Memorandum of Understanding (MOU) for new renewable energy space technology initiative

26.4.3 Sustainable Development Plan, 2008-2020

26.4.4 Montserrat Energy Policy, 2016-2030

26.4.5 Climate Change Policy

26.5 Opportunities and Threats in Renewable Energy Deployment

26.5.1 Opportunities

26.5.2 Threats

26.6 Power Market, Montserrat, Electricity Tariff by Segment

27 Power Market, Mexico

27.1 Power Market, Mexico, Present Scenario

27.2 Power Market, Mexico, Installed Capacity, 2006–2018

27.2.1 Power Market, Mexico, Installed Capacity Mix, 2018

27.3 Power Market, Mexico, Future Outlook

27.3.1 Power Market, Mexico, Installed Capacity, 2019–2030

27.3.2 Power Market, Mexico, Installed Capacity Mix, 2018–2030

27.3.3 Power Market, Mexico, Target Vs. Possible Achievement

27.4 Power Market, Mexico, Renewable Policy and Roadmap

27.4.1 Electricity Industry Law

27.4.2 Universal Power Service Fund

27.4.3 National Energy Strategy

27.4.4 Energy Transition Law (Ley de Transición Energética, LTE)

27.4.5 General Law of Climate Change (Ley General de Cambio Climático)

27.4.6 National Electricity Plan

27.4.7 Program development of the National Electricity System (PRODESEN)

27.4.8 Net-Metering/Net Billing

27.4.9 Auction Mechanism

27.4.10 National Commission for the Efficient Use of Energy

27.4.11 Teaching Environmental Responsibility Program

27.4.12 Accelerated Depreciation

27.4.13 Wheeling Service Agreement for Electricity from Renewable Energy Sources

27.4.14 Methodology to Establish Service Charges for the Transmission of Renewable Electricity

27.4.15 Resolution on transmission charges for renewable energy generators

27.4.16 Grid Interconnection Contract for Renewable Energy

27.4.17 Renewable Energy Promotion-PromovER

27.4.18 Integrated Energy Services Project, 2007–2014

27.4.19 Light for Mexico Program

27.4.20 Income Tax Law

27.4.21 Resolution on Interconnection of large hydro plants

27.4.22 Geothermal Energy Act

27.4.23 Law for the Promotion and Development of Bioenergy

27.4.24 Sustainable Rural Development Project for the Promotion of Alternative Energy Sources in Agribusiness

27.4.25 Value Added Agribusiness Risk Sharing Schemes

27.4.26 Removal of custom duty on Imported Solar Modules

27.4.27 21st Century Power Partnership (21CPP)

27.4.28 Program for Financing of Electric Energy Saving

27.4.29 Guidelines establishing and issuing Clean Energy Certificates

27.4.30 Law for the Sustainable Use of Energy (Ley para el Aprovechamiento Sustentable de la Energía, LASE)

27.4.31 Law for Sustainable Use of Energy and the National Program for the Sustainable Use of Energy (PRONASE)

27.4.32 Green Mortgage Program

27.4.33 Nationally Determined Contribution (NDC) to the Paris Agreement (COP21)

27.5 Opportunities and Threats in Renewable Energy Deployment

27.5.1 Opportunities

27.5.2 Threats

27.6 Power Market, Mexico, Electricity Tariff by Segment

28 Power Market, Nicaragua

28.1 Power Market, Nicaragua, Present Scenario

28.2 Power Market, Nicaragua, Installed Capacity, 2006–2018

28.2.1 Power Market, Nicaragua, Installed Capacity Mix, 2018

28.3 Power Market, Nicaragua, Future Outlook

28.3.1 Power Market, Nicaragua, Installed Capacity, 2019–2030

28.3.2 Power Market, Nicaragua, Installed Capacity Mix, 2018–2030

28.3.3 Power Market, Nicaragua, Goal Vs. Possible Achievement, 2027

28.4 Power Market, Nicaragua, Renewable Policy and Roadmap

28.4.1 National Energy Policy

28.4.2 Electricity Generation Expansion Plan, 2016–2030

28.4.3 Reference prices for renewables

28.4.4 National Sustainable Electrification and Renewable Energy Program (PNESER)

28.4.5 Loans and Grants

28.4.6 Tender for the construction of electricity networks in Nicaragua

28.4.7 Off grid Rural Electrification Project (PERZA)

28.4.8 New regulation for self-consumption and net metering

28.4.9 New Solar Plants in Nicaragua

28.4.10 Rural Electrification Policy

28.4.11 Law for the Exploration and Exploitation of Geothermal Resources

28.4.12 Law for the promotion of Hydroelectricity

28.5 Opportunities and Threats in Renewable Energy Deployment

28.5.1 Opportunities

28.5.2 Threats

28.6 Power Market, Nicaragua, Electricity Tariff by Segment

29 Power Market, Panama

29.1 Power Market, Panama, Present Scenario

29.2 Power Market, Panama, Installed Capacity, 2006–2018

29.2.1 Power Market, Panama, Installed Capacity Mix, 2018

29.3 Power Market, Panama, Future Outlook

29.3.1 Power Market, Panama, Installed Capacity, 2019–2030

29.3.2 Power Market, Panama, Installed Capacity Mix, 2018–2030

29.3.3 Power Market, Panama, Goal Vs. Possible Achievement

29.4 Power Market, Panama, Renewable Policy and Roadmap

29.4.1 National Energy Plan, 2015–2050

29.4.2 Tax Incentives

29.4.3 Net Metering

29.4.4 Renewable Energy Incentives Law 45

29.4.5 Auctions

29.5 Opportunities and Threats in Renewable Energy Deployment

29.5.1 Opportunities

29.5.2 Threats

29.6 Power Market, Panama, Electricity Tariff by Segment

30 Power Market, Puerto Rico

30.1 Power Market, Puerto Rico, Present Scenario

30.1.1 Power Market, Puerto Rico, Installed Capacity, 2006–2018

30.1.2 Power Market, Puerto Rico, Installed Capacity Mix, 2018

30.2 Power Market, Puerto Rico, Future Outlook

30.2.1 Power Market, Puerto Rico, Installed Capacity, 2019–2030

30.2.2 Power Market, Puerto Rico, Installed Capacity Mix, 2018–2030

30.2.3 Power Market, Puerto Rico, Target Vs. Possible Achievement, 2025

30.3 Power Market, Puerto Rico, Renewable Policy and Roadmap

30.3.1 Regulation on Integrated Resource Planning for the Puerto Rico Electric Power Authority

30.3.2 Regulation on Microgrid Development

30.3.3 Ley para Transformar el Sistema Eléctrico de Puerto Rico (Law to Transform the Electric System of Puerto Rico)

30.3.4 Net Metering/Billing

30.3.5 Renewable Energy Policy Act

30.3.6 Green Energy Incentives Act

30.3.7 Tax Exemptions

30.3.8 Tax Credits

30.3.9 Rebate Program Incentives

30.4 Opportunities and Threats in Renewable Energy Deployment

30.4.1 Threats or Barriers

30.5 Power Market, Puerto Rico, Electricity Tariff by Segment

31 Power Market, St. Kitts and Nevis

31.1 Power Market, St. Kitts and Nevis, Present Scenario

31.2 Power Market, St. Kitts and Nevis, Installed Capacity, 2006–2018

31.2.1 Power Market, St Kitts and Nevis, Installed Capacity Mix, 2018

31.3 Power Market, St Kitts and Nevis, Future Outlook

31.3.1 Power Market, St. Kitts and Nevis, Installed Capacity, 2019–2030

31.3.2 Power Market, St. Kitts and Nevis, Installed Capacity Mix, 2018–2030

31.4 Power Market, St. Kitts and Nevis, Renewable Policy and Roadmap

31.4.1 Contract for 10 MW geothermal plant

31.4.2 Sector Budget Support Program

31.4.3 Largest Caribbean solar-plus storage plant

31.4.4 National Energy Policy

31.4.5 Tax Reduction/Exemption

31.5 Opportunities and Threats in Renewable Energy Deployment

31.5.1 Opportunities

31.5.2 Threats

31.6 Power Market, St. Kitts and Nevis, Electricity Tariff by Segment

32 Power Market, St Lucia

32.1 Power Market, St Lucia, Present Scenario

32.1.1 Power Market, St Lucia, Installed Capacity, 2006–2018

32.1.2 Power Market, St Lucia, Installed Capacity Mix, 2018

32.2 Power Market, St Lucia, Future Outlook

32.2.1 Power Market, St Lucia, Installed Capacity, 2019–2030

32.2.2 Power Market, St Lucia, Installed Capacity Mix, 2018–2030

32.2.3 Power Market, St. Lucia, Goal Vs. Possible Achievement

32.3 Power Market, St Lucia, Renewable Policy and Roadmap

32.4 Opportunities and Threats in Renewable Energy Deployment

32.5 Power Market, St. Lucia, Electricity Tariff by Segment

33 Power Market, Sint Maarten

33.1 Power Market, Sint Maarten, Present Scenario

33.2 Power Market, Sint Maarten, Installed Capacity, 2011–2018

33.2.1 Power Market, Sint Maarten, Installed Capacity Mix, 2018

33.3 Power Market, Sint Maarten, Future Outlook

33.3.1 Power Market, Sint Maarten, Installed Capacity, 2019–2030

33.3.2 Power Market, Sint Maarten, Installed Capacity Mix, 2018–2030

33.3.3 Power Market, Sint Maarten, Goal Vs. Possible Achievement, 2020

33.4 Power Market, Sint Maarten, Renewable Policy and Roadmap

33.4.1 National Energy Policy

33.4.2 Agreement for solar power farm

33.4.3 Sustainable Development Goals (SDG) 2030

33.4.4 National Recovery and Resilience Plan

33.4.5 Electricity Concessions Ordinance

33.4.6 Net Metering

33.5 Opportunities and Threats in Renewable Energy Deployment

33.5.1 Opportunities

33.5.2 Threats

33.6 Power Market, Sint Maarten, Electricity Tariff

34 Power Market, St. Vincent and Grenadines

34.1 Power Market, St. Vincent and Grenadines, Present Scenario

34.2 Power Market, St. Vincent and Grenadines, Installed Capacity, 2006–2018

34.2.1 Power Market, St. Vincent and Grenadines, Installed Capacity Mix, 2018

34.3 Power Market, St. Vincent and Grenadines, Future Outlook

34.3.1 Power Market, St. Vincent and Grenadines, Installed Capacity, 2019–2030

34.3.2 Power Market, St. Vincent and Grenadines, Installed Capacity Mix, 2018–2030

34.3.3 Power Market, St. Vincent and Grenadines, Target Vs. Possible Achievement, 2020

34.4 Power Market, St. Vincent and Grenadines, Renewable Policy and Roadmap

34.4.1 Government stake in geothermal project

34.4.2 Caribbean Development Bank (CDB) to provide funding for geothermal project

34.4.3 Drilling Contract Signed For Geothermal Project

34.4.4 VINLEC first solar-battery storage microgrid in Grenadines

34.4.5 National Energy Policy

34.4.6 Energy Action Plan

34.4.7 National Economic and Social Development Plan, 2013–2025

34.4.8 Net Billing/ Feed-in Tariff

34.4.9 Tax Exemption/Reduction

34.5 Opportunities and Threats in Renewable Energy Deployment

34.5.1 Opportunities

34.5.2 Threats

34.6 Power Market, St. Vincent and Grenadines, Electricity Tariff by Segment

35 Power Market, Suriname

35.1 Power Market, Suriname, Present Scenario

35.1.1 Power Market, Suriname, Installed Capacity, 2006–2018

35.1.2 Power Market, Suriname, Installed Capacity Mix, 2018

35.2 Power Market, Suriname, Future Outlook

35.2.1 Power Market, Suriname, Installed Capacity, 2019–2030

35.2.2 Power Market, Suriname, Installed Capacity Mix, 2018–2030

35.2.3 Power Market, Suriname, Goal vs. Possible Achievement

35.3 Power Market, Suriname, Renewable Policy and Roadmap

35.3.1 Development of Renewable Energy, Energy Efficiency and Electrification

35.3.2 National Energy Plan, 2013-2033

35.3.3 Electricity Act, 2016

35.3.4 Renewable energy tenders

35.3.5 Electricity System Upgrade and Expansion

35.3.6 Energy Sector Policy-Based Loan

35.3.7 Net Metering

35.3.8 Capacity Building Program on RETs

35.3.9 Sustainable Development Policy

35.3.10 International Solar Alliance

35.4 Opportunities and Threats in Renewable Energy Development

35.4.1 Opportunities

35.4.2 Threats

35.5 Power Market, Suriname, Electricity Tariff by Segment

36 Power Market, Turks and Caicos

36.1 Power Market, Turks and Caicos, Present Scenario

36.2 Power Market, Turks and Caicos, Installed Capacity, 2006–2018

36.2.1 Power Market, Turks and Caicos, Installed Capacity Mix, 2018

36.3 Power Market, Turks and Caicos, Future Outlook

36.3.1 Power Market, Turks and Caicos, Installed Capacity, 2019–2030

36.3.2 Power Market, Turks and Caicos, Installed Capacity Mix, 2018–2030

36.3.3 Power Market, Turks and Caicos, Target Vs. Possible Achievement

36.4 Power Market, Turks and Caicos, Renewable Policy and Roadmap

36.4.1 Resilient National Energy Transition Strategy (R-NETS), 2019–2040

36.4.2 Energy Conservation Policy

36.4.3 Climate Change Policy

36.4.4 Fortis CORE AND UORE program

36.5 Opportunities and Threats in Renewable Energy Deployment

36.5.1 Opportunities

36.5.2 Threats

36.6 Power Market, Turks and Caicos, Electricity Tariff by Segment

37 Power Market, Trinidad and Tobago

37.1 Power Market, Trinidad and Tobago, Present Scenario

37.1.1 Power Market, Trinidad and Tobago, Installed Capacity, 2006–2018

37.1.2 Power Market, Trinidad and Tobago, Installed Capacity Mix, 2018

37.2 Power Market, Trinidad and Tobago, Future Outlook

37.2.1 Power Market, Trinidad and Tobago, Installed Capacity, 2019–2030

37.2.2 Power Market, Trinidad and Tobago, Installed Capacity Mix, 2018–2030

37.2.3 Power Market, Trinidad and Tobago, Target vs. Possible Achievement

37.3 Power Market, Trinidad and Tobago, Renewable Policy and Roadmap

37.3.1 National Environment Policy

37.3.2 Framework for Development of Renewable Energy Policy

37.3.3 National Renewable Energy Policy

37.3.4 National Climate Change Policy

37.3.5 United States of America Department of Energy (USDOE) Memorandum of Understanding (MOU) – Regional Renewable Energy Research Center

37.3.6 2030 Emissions Reduction Target

37.3.7 Accelerated Depreciation

37.3.8 Tax Credits

37.3.9 Tax Exemptions

37.4 Opportunities and Threats in Renewable Energy Deployment

37.4.1 Opportunities

37.4.2 Threats

37.5 Power Market, Trinidad and Tobago, Electricity Tariff by Segment

38 Appendix

38.1 Abbreviations

38.2 Methodology

38.3 Coverage

38.3.1 Secondary Research

38.3.2 Primary Research

38.3.3 Modeling and Forecasting

38.4 Contact Us

38.5 Disclaimer

List of Tables

Table 1: Power Market, CARICOM Countries, Renewable Energy Policy Measures, 2018

Table 2: Power Market, CARICOM Countries, Cumulative Installed Capacity by Type (MW), 2006–2018

Table ...

Table 1: Power Market, CARICOM Countries, Renewable Energy Policy Measures, 2018

Table 2: Power Market, CARICOM Countries, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 3: Power Market, CARICOM Countries, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 4: Power Market, CARICOM Countries, Installed Capacity Mix (%), 2018–2030

Table 5: Power Market, Anguilla, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 6: Power Market, Anguilla, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 7: Power Market, Anguilla, Installed Capacity Mix (%),2018–2030

Table 8: Power Market, Antigua and Barbuda, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 9: Power Market, Antigua and Barbuda, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 10: Power Market, Antigua and Barbuda, Installed Capacity Mix (%), 2018–2030

Table 11: Power Market, Aruba, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 12: Power Market, Aruba, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 13: Power Market, Aruba, Installed Capacity Mix (%), 2018–2030

Table 14: Power Market, Aruba, Bill for Solar Power, Tariffs

Table 15: Power Market, Aruba, Purchase of Solar Power, Tariffs

Table 16: Power Market, Barbados, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 17: Power Market, Barbados, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 18: Power Market, Barbados, Installed Capacity Mix (%), 2018–2030

Table 19: Power Market, Bahamas, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 20: Power Market, Bahamas, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 21: Power Market, Bahamas, Installed Capacity Mix (%), 2018–2030

Table 22: Power Market, Belize, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 23: Power Market, Belize, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 24: Power Market, Belize, Installed Capacity Mix (%), 2018–2030

Table 25: Power Market, Bermuda, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 26: Power Market, Bermuda, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 27: Power Market, Bermuda, Installed Capacity Mix (%), 2018–2030

Table 28: Power Market, British Virgin Islands, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 29: Power Market, British Virgin Islands, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 30: Power Market, British Virgin Islands, Installed Capacity Mix (%),2018–2030

Table 31: Power Market, Cayman Islands, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 32: Power Market, Cayman Islands, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 33: Power Market, Cayman Islands, Installed Capacity Mix (%), 2018–2030

Table 34: Power Market, Cayman Islands: CORE Tariff Rates, 2016

Table 35: Power Market, Cayman Islands: Revised CORE Tariff Rates, 2017 & 2019

Table 36: Power Market, Colombia, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 37: Power Market, Colombia, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 38: Power Market, Colombia, Installed Capacity Mix (%), 2018–2030

Table 39: Power Market, Colombia, Electricity Tariff for Residential Sector Voltage Level 1

Table 40: Power Market, Colombia, Electricity Tariff for Residential Sector Voltage Level 1

Table 41: Power Market, Colombia, Electricity Tariff for Non Residential Sector

Table 42: Power Market, Colombia, Price to Public, Regulated Freedom Regime

Table 43: Power Market, Colombia, Price to Public, Special Situations

Table 44: Power Market, Colombia, Price to Public, Materials

Table 45: Power Market, Costa Rica, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 46: Power Market, Costa Rica, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 47: Power Market, Costa Rica, Installed Capacity Mix (%),2018–2030

Table 48: Power Market, Curacao, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 49: Power Market, Curacao, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 50: Power Market, Curacao, Installed Capacity Mix (%), 2018–2030

Table 51: Power Market, Dominica, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 52: Power Market, Dominica, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 53: Power Market, Dominica, Installed Capacity Mix (%), 2018–2030

Table 54: Power Market, Dominican Republic, Renewable Projects Announced in 2017 by CDEEE

Table 55: Power Market, Dominican Republic, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 56: Power Market, Dominican Republic, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 57: Power Market, Dominican Republic, Installed Capacity Mix (%), 2018–2030

Table 58: Power Market, Dominican Republic, No. of Net Metering Customers by Installation Size, 2014

Table 59: Power Market, El Salvador, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 60: Power Market, El Salvador, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 61: Power Market, El Salvador, Installed Capacity Mix (%), 2018–2030

Table 62: Power Market, EL Salvador, Renewable Auction Result, 2014-2019

Table 63: Power Market, El-Salvador, Electricity Tariff for Block 1: First 99 kWh / month

Table 64: Power Market, El-Salvador, Electricity Tariff for Block 2: Consumption between 100 kWh / month and 199 kWh / month

Table 65: Power Market, El-Salvador, Electricity Tariff for Block 3: Consumption greater than or equal to 200 kWh / month

Table 66: Power Market, El-Salvador, Electricity Tariff for General Use

Table 67: Power Market, El-Salvador, Electricity Tariff for Street Lighting

Table 68: Power Market, El-Salvador, Electricity Tariff for Low Voltage with Power Measurement

Table 69: Power Market, El-Salvador, Electricity Tariff for Medium voltage with Power Measurement

Table 70: Power Market, El-Salvador, Electricity Tariff for Low Voltage with Time Meter

Table 71: Power Market, El-Salvador, Electricity Tariff for Medium Voltage with Time Meter

Table 72: Power Market, El-Salvador, Electricity Tariff for Low Voltage with Time Meter

Table 73: Power Market, El-Salvador, Electricity Tariff for Medium Voltage with Time Meter

Table 74: Power Market, Guatemala, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 75: Power Market, Guatemala, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 76: Power Market, Guatemala, Installed Capacity Mix (%), 2018–2030

Table 77: Power Market, Guatemala, Rates of Social and Non-Social Electricity, (Q / kWh)

Table 78: Power Market, Guatemala, Rates of Social and Non-Social Electricity, ($ / kWh)

Table 79: Power Market, Grenada, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 80: Power Market, Grenada, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 81: Power Market, Grenada, Installed Capacity Mix (%), 2018–2030

Table 82: Power Market, Guyana, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 83: Power Market, Guyana, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 84: Power Market, Guyana, Installed Capacity Mix (%),2018–2030

Table 85: Power Market, Haiti, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 86: Power Market, Haiti, List of Microgrids, 2019

Table 87: Power Market, Haiti, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 88: Power Market, Haiti, Installed Capacity Mix (%),2018–2030

Table 89: Power Market, Haiti, Distribution of Regional and Micro Networks, 2019

Table 90: Power Market, Honduras, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 91: Power Market, Honduras, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 92: Power Market, Honduras, Installed Capacity Mix (%),2018–2030

Table 93: Power Market, Jamaica, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 94: Power Market, Jamaica, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 95: Power Market, Jamaica, Installed Capacity Mix (%), 2018–2030

Table 96: Power Market, Jamaica, DBJ Credit Lines

Table 97: Power Market, Montserrat, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 98: Power Market, Montserrat, Installed Capacity Mix (%),2018–2030

Table 99: Power Market, Mexico, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 100: Power Market, Mexico, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 101: Power Market, Mexico, Installed Capacity Mix (%), 2018–2030

Table 102: Mexico, Energy and Climate National Targets

Table 103: Mexico, Auction 1 , Winners, March 2016

Table 104: Mexico, Auction 2 , Winners, September 2016

Table 105: Mexico, Auction 3 , Winners, November 2017

Table 106: Power Market, Mexico, Domestic Rates (Low Voltage)

Table 107: Power Market, Mexico, Public Services Rates

Table 108: Power Market, Mexico, Agriculture Rates

Table 109: Power Market, Mexico, Commercial Rates

Table 110: Power Market, Mexico, Industrial Rates

Table 111: Power Market, Nicaragua, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 112: Power Market, Nicaragua, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 113: Power Market, Nicaragua, Installed Capacity Mix (%), 2018–2030

Table 114: Power Market, Panama, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 115: Power Market, Panama, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 116: Power Market, Panama, Installed Capacity Mix (%), 2018–2030

Table 117: Power Market, Panama, Renewable Energy Auctions

Table 118: Power Market, Panama, Electricity Tariff for Customers With Pre-paid measurements

Table 119: Power Market, Panama, Electricity Tariff for Customers With Consumption 0-300 kWh

Table 120: Power Market, Panama, Electricity Tariff for Customers With Consumption 301-750 kWh

Table 121: Power Market, Panama, Electricity Tariff for Customers With Consumption more than 750 kWh

Table 122: Power Market, Panama, Electricity Tariff as BTD Rate: Maximum Demand Rate

Table 123: Power Market, Panama, Electricity Tariff as BTH Rate: Schedule Block Rate

Table 124: Power Market, Panama, Electricity Tariff as MTD : Rate with Maximum Demand

Table 125: Power Market, Panama, Electricity Tariff as MTH Tariff Rates: Schedule Block Rate

Table 126: Power Market, Panama, Electricity Tariff as ATD: Maximum Demand Rate

Table 127: Power Market, Panama, Electricity Tariff as ATH Tariff Rates: Schedule Block Rate

Table 128: Power Market, Puerto Rico, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 129: Power Market, Puerto Rico, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 130: Power Market, Puerto Rico, Installed Capacity Mix (%), 2018–2030

Table 131: Power Market, St Kitts and Nevis, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 132: Power Market, St Kitts and Nevis, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 133: Power Market, St. Kitts and Nevis, Installed Capacity Mix (%), 2018–2030

Table 134: Power Market, St Lucia, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 135: Power Market, St Lucia, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 136: Power Market, St Lucia, Installed Capacity Mix (%), 2018–2030

Table 137: Power Market, Sint Maarten, Cumulative Installed Capacity by Type (MW), 2011–2018

Table 138: Power Market, Sint Maarten, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 139: Power Market, Sint Maarten, Installed Capacity Mix (%), 2018–2030

Table 140: Power Market, St. Vincent and the Grenadines, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 141: Power Market, St. Vincent and Grenadines, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 142: Power Market, St. Vincent and Grenadines, Installed Capacity Mix (%), 2018–2030

Table 143: Power Market, Suriname, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 144: Power Market, Suriname, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 145: Power Market, Suriname, Installed Capacity Mix (%), 2018–2030

Table 146: Power Market, Turks and Caicos Islands, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 147: Power Market, Trinidad and Tobago, Cumulative Installed Capacity by Type (MW), 2006–2018

Table 148: Power Market, Trinidad and Tobago, Cumulative Installed Capacity by Type (MW), 2019–2030

Table 149: Power Market, Trinidad and Tobago, Installed Capacity Mix (%), 2018–2030

Table 150: Abbreviations

List of Figures

Figure 1: Power Market, CARICOM Countries, Cumulative Installed Capacity (MW), 2006–2030

Figure 2: Power Market, CARICOM Countries, Share of Total Installed Capacity by Fuel Type ...

Figure 1: Power Market, CARICOM Countries, Cumulative Installed Capacity (MW), 2006–2030

Figure 2: Power Market, CARICOM Countries, Share of Total Installed Capacity by Fuel Type (%), 2006–2018

Figure 3: Power Market, CARICOM Countries, Share of Total Installed Capacity by Fuel Type (%), 2019 & 2030

Figure 4: Power Market, CARICOM Countries, Generation Mix (%), 2018

Figure 5: Power Market, CARICOM Countries, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 6: Power Market, CARICOM Countries, Installed Capacity Mix (%), 2018

Figure 7: Power Market, CARICOM Countries, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 8: Power Market, CARICOM Countries, Installed Capacity Mix (%),2018–2030

Figure 9: Power Market, Anguilla, Electric System

Figure 10: Power Market, Anguilla, Generation Mix (%), 2018

Figure 11: Power Market, Anguilla, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 12: Power Market, Anguilla, Installed Capacity Mix (%), 2018

Figure 13: Power Market, Anguilla, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 14: Power Market, Anguilla, Installed Capacity Mix (%),2018–2030

Figure 15: Power Market, Antigua and Barbuda, Electric System

Figure 16: Power Market, Antigua and Barbuda, Generation Mix (%), 2018

Figure 17: Power Market, Antigua and Barbuda, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 18: Power Market, Antigua and Barbuda, Installed Capacity Mix (%), 2018

Figure 19: Power Market, Antigua and Barbuda, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 20: Power Market, Antigua and Barbuda, Installed Capacity Mix (%),2018–2030

Figure 21: Power Market, Antigua and Barbuda, Goal Vs. Possible Achievement, 2020 & 2030

Figure 22: Power Market, Aruba, Electric System

Figure 23: Power Market, Aruba, Generation Mix (%), 2018

Figure 24: Power Market, Aruba, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 25: Power Market, Aruba, Installed Capacity Mix (%), 2018

Figure 26: Power Market, Aruba, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 27: Power Market, Aruba, Installed Capacity Mix (%),2018–2030

Figure 28: Power Market, Aruba, Goal Vs. Possible Achievement, 2020

Figure 29: Power Market, Barbados, Electric System

Figure 30: Power Market, Barbados, Generation Mix (%), 2018

Figure 31: Power Market, Barbados, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 32: Power Market, Barbados, Installed Capacity Mix (%), 2018

Figure 33: Power Market, Barbados, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 34: Power Market, Barbados, Installed Capacity Mix (%),2018–2030

Figure 35: Power Market, Barbados, Goal Vs. Possible Achievement, 2030

Figure 36: Power Market, Bahamas, Electric System

Figure 37: Power Market, Bahamas, Generation Mix (%), 2018

Figure 38: Power Market, Bahamas, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 39: Power Market, Bahamas, Installed Capacity Mix (%), 2018

Figure 40: Power Market, Bahamas, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 41: Power Market, Bahamas, Installed Capacity Mix (%),2018–2030

Figure 42: Power Market, Bahamas, Target Vs. Possible Achievement, 2030

Figure 43: Power Market, Belize, Electric System

Figure 44: Power Market, Belize, Generation Mix (%), 2018

Figure 45: Power Market, Belize, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 46: Power Market, Belize, Installed Capacity Mix (%), 2018

Figure 47: Power Market, Belize, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 48: Power Market, Belize, Installed Capacity Mix (%),2018–2030

Figure 49: Power Market, Belize, Target Vs. Possible Achievement, 2030

Figure 50: Power Market, Bermuda, Electric System

Figure 51: Power Market, Bermuda, Generation Mix (%), 2018

Figure 52: Power Market, Bermuda, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 53: Power Market, Bermuda, Installed Capacity Mix (%), 2018

Figure 54: Power Market, Bermuda, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 55: Power Market, Bermuda, Installed Capacity Mix (%),2018–2030

Figure 56: Power Market, Bermuda, Target Vs. Possible Achievement

Figure 57: Power Market, British Virgin Islands, Electric System

Figure 58: Power Market, British Virgin Islands, Generation Mix (%), 2018

Figure 59: Power Market, British Virgin Islands, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 60: Power Market, British Virgin Islands, Installed Capacity Mix (%), 2018

Figure 61: Power Market, British Virgin Islands, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 62: Power Market, British Virgin Islands, Installed Capacity Mix (%),2018–2030

Figure 63: Power Market, British Virgin Islands, Target Vs. Possible Achievement, 2023

Figure 64: Power Market, Cayman Islands, Electric System

Figure 65: Power Market, Cayman Islands, Generation Mix (%), 2018

Figure 66: Power Market, Cayman Islands, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 67: Power Market, Cayman Islands, Installed Capacity Mix (%), 2018

Figure 68: Power Market, Cayman Islands, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 69: Power Market, Cayman Islands, Installed Capacity Mix (%),2018–2030

Figure 70: Power Market, Cayman Islands, Target Vs. Possible Achievement

Figure 71: Power Market, Colombia, Electric System

Figure 72: Power Market, Colombia, Generation Mix (%), 2018

Figure 73: Power Market, Colombia, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 74: Power Market, Colombia, Installed Capacity Mix (%), 2018

Figure 75: Power Market, Colombia, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 76: Power Market, Colombia, Installed Capacity Mix (%),2018–2030

Figure 77: Power Market, Colombia, Plan Vs. Possible Achievement, 2028

Figure 78: Power Market, Costa Rica, Electric System

Figure 79: Power Market, Costa Rica, Generation Mix (%), 2018

Figure 80: Power Market, Costa Rica, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 81: Power Market, Costa Rica, Installed Capacity Mix (%), 2018

Figure 82: Power Market, Costa Rica, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 83: Power Market, Costa Rica, Installed Capacity Mix (%),2018–2030

Figure 84: Power Market, Costa Rica, Goal Vs. Possible Achievement, 2021

Figure 85: Power Market, Curacao, Electric System

Figure 86: Power Market, Curacao, Generation Mix (%), 2018

Figure 87: Power Market, Curacao, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 88: Power Market, Curacao, Installed Capacity Mix (%), 2018

Figure 89: Power Market, Curacao, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 90: Power Market, Curacao, Installed Capacity Mix (%),2018–2030

Figure 91: Power Market, Curacao, Goal Vs. Possible Achievement

Figure 92: Power Market, Dominica, Electric System

Figure 93: Power Market, Dominica, Generation Mix (%), 2018

Figure 94: Power Market, Dominica, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 95: Power Market, Dominica, Installed Capacity Mix (%), 2018

Figure 96: Power Market, Dominica, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 97: Power Market, Dominica, Installed Capacity Mix (%),2018–2030

Figure 98: Power Market, Dominica, Target Vs. Possible Achievement, 2020

Figure 99: Power Market, Dominican Republic, Electric System

Figure 100: Power Market, Dominican Republic, Generation Mix (%), 2018

Figure 101: Power Market, Dominican Republic, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 102: Power Market, Dominican Republic, Installed Capacity Mix (%), 2018

Figure 103: Power Market, Dominican Republic, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 104: Power Market, Dominican Republic, Installed Capacity Mix (%),2018–2030

Figure 105: Power Market, Dominican Republic, Target Vs. Possible Achievement, 2025

Figure 106: Power Market, El Salvador, Electric System

Figure 107: Power Market, El Salvador, Generation Mix (%), 2018

Figure 108: Power Market, El Salvador, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 109: Power Market, El Salvador, Installed Capacity Mix (%), 2018

Figure 110: Power Market, El Salvador, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 111: Power Market, El Salvador, Installed Capacity Mix (%),2018–2030

Figure 112: Power Market, Guatemala, Electric System

Figure 113: Power Market, Guatemala, Generation Mix (%), 2018

Figure 114: Power Market, Guatemala, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 115: Power Market, Guatemala, Installed Capacity Mix (%), 2018

Figure 116: Power Market, Guatemala, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 117: Power Market, Guatemala, Installed Capacity Mix (%),2018–2030

Figure 118: Power Market, Guatemala Target Vs. Possible Achievement, 2027

Figure 119: Power Market, Grenada, Electric System

Figure 120: Power Market, Grenada, Generation Mix (%), 2018

Figure 121: Power Market, Grenada, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 122: Power Market, Grenada, Installed Capacity Mix (%), 2018

Figure 123: Power Market, Grenada, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 124: Power Market, Grenada, Installed Capacity Mix (%),2018–2030

Figure 125: Power Market, Greanada, Goal Vs. Possible Achievement, 2020 & 2030

Figure 126: Power Market, Guyana, Electric System

Figure 127: Power Market, Guyana, Generation Mix (%), 2018

Figure 128: Power Market, Guyana, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 129: Power Market, Guyana, Installed Capacity Mix (%), 2018

Figure 130: Power Market, Guyana, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 131: Power Market, Guyana, Installed Capacity Mix, 2018–2030

Figure 132: Power Market, Guyana, Goal Vs. Possible Achievement, 2025

Figure 133: Power Market, Haiti, Electric System

Figure 134: Power Market, Haiti, Generation Mix (%), 2018

Figure 135: Power Market, Haiti, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 136: Power Market, Haiti, Installed Capacity Mix (%), 2018

Figure 137: Power Market, Haiti, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 138: Power Market, Haiti, Installed Capacity Mix (%),2018–2030

Figure 139: Power Market, Honduras, Electric System

Figure 140: Power Market, Honduras, Generation Mix (%), 2018

Figure 141: Power Market, Honduras, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 142: Power Market, Honduras, Installed Capacity Mix (%), 2018

Figure 143: Power Market, Honduras, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 144: Power Market, Honduras, Installed Capacity Mix (%),2018–2030

Figure 145: Power Market, Honduras, Target Vs. Possible Achievement, 2022

Figure 146: Power Market, Jamaica, Electric System

Figure 147: Power Market, Jamaica, Generation Mix (%), 2018

Figure 148: Power Market, Jamaica, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 149: Power Market, Jamaica, Installed Capacity Mix (%), 2018

Figure 150: Power Market, Jamaica, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 151: Power Market, Jamaica, Installed Capacity Mix (%),2018–2030

Figure 152: Power Market, Jamaica, Goal Vs. Possible Achievement

Figure 153: Power Market, Montserrat, Electric System

Figure 154: Power Market, Montserrat, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 155: Power Market, Montserrat, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 156: Power Market, Montserrat, Installed Capacity Mix (%),2018–2030

Figure 157: Power Market, Montserrat, Goal Vs. Possible Achievement, 2020

Figure 158: Power Market, Mexico, Electric System

Figure 159: Power Market, Mexico, Generation Mix (%), 2018

Figure 160: Power Market, Mexico, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 161: Power Market, Mexico, Installed Capacity Mix (%), 2018

Figure 162: Power Market, Mexico, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 163: Power Market, Mexico, Installed Capacity Mix (%),2018–2030

Figure 164: Power Market, Mexico, Target Vs. Possible Achievement, 2021 & 2024

Figure 165: Power Market, Nicaragua, Electric System

Figure 166: Power Market, Nicaragua, Generation Mix (%), 2018

Figure 167: Power Market, Nicaragua, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 168: Power Market, Nicaragua, Installed Capacity Mix (%), 2018

Figure 169: Power Market, Nicaragua, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 170: Power Market, Nicaragua, Installed Capacity Mix (%),2018–2030

Figure 171: Power Market, Nicaragua, Goal Vs. Possible Achievement, 2027

Figure 172: Power Market, Panama, Electric System

Figure 173: Power Market, Panama, Generation Mix (%), 2018

Figure 174: Power Market, Panama, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 175: Power Market, Panama, Installed Capacity Mix (%), 2018

Figure 176: Power Market, Panama, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 177: Power Market, Panama, Installed Capacity Mix (%),2018–2030

Figure 178: Power Market, Panama, Goal Vs. Possible Achievement

Figure 179: Power Market, Puerto Rico, Electric System

Figure 180: Power Market, Puerto Rico, Generation Mix (%), 2018

Figure 181: Power Market, Puerto Rico, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 182: Power Market, Puerto Rico, Installed Capacity Mix (%), 2018

Figure 183: Power Market, Puerto Rico, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 184: Power Market, Puerto Rico, Installed Capacity Mix (%),2018–2030

Figure 185: Power Market, Puerto Rico, Target Vs. Possible Achievement, 2025

Figure 186: Power Market, St. Kitts and Nevis, Electric System

Figure 187: Power Market, St. Kitts and Nevis, Generation Mix (%), 2018

Figure 188: Power Market, St. Kitts and Nevis, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 189: Power Market, St Kitts and Nevis, Installed Capacity Mix (%), 2018

Figure 190: Power Market, St. Kitts and Nevis, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 191: Power Market, St. Kitts and Nevis, Installed Capacity Mix (%),2018–2030

Figure 192: Power Market, St Lucia, Electric System

Figure 193: Power Market, St. Lucia, Generation Mix (%), 2018

Figure 194: Power Market, St Lucia, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 195: Power Market, St Lucia, Installed Capacity Mix (%), 2018

Figure 196: Power Market, St Lucia, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 197: Power Market, St Lucia, Installed Capacity Mix (%),2018–2030

Figure 198: Power Market, St. Lucia, Goal Vs. Possible Achievement, 2025 & 2030

Figure 199: Power Market, Sint Maarten, Electric System

Figure 200: Power Market, Sint Maarten, Generation Mix (%), 2018

Figure 201: Power Market, Sint Maarten, Cumulative Installed Capacity by Type (MW), 2011–2018

Figure 202: Power Market, Sint Maarten, Installed Capacity Mix (%), 2018

Figure 203: Power Market, Sint Maarten, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 204: Power Market, Sint Maarten, Installed Capacity Mix (%),2018–2030

Figure 205: Power Market, Sint Maarten, Goal Vs. Possible Achievement, 2020

Figure 206: Power Market, St. Vincent and Grenadines, Electric System

Figure 207: Power Market, St. Vincent and Grenadines, Generation Mix (%), 2018

Figure 208: Power Market, St. Vincent and Grenadines, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 209: Power Market, St. Vincent and Grenadines, Installed Capacity Mix (%), 2018

Figure 210: Power Market, St. Vincent and Grenadines, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 211: Power Market, St. Vincent and Grenadines, Installed Capacity Mix (%),2018–2030

Figure 212: Power Market, St. Vincent and Grenadines, Target Vs. Possible Achievement, 2020

Figure 213: Power Market, Suriname, Electric System

Figure 214: Power Market, Suriname, Generation Mix (%), 2018

Figure 215: Power Market, Suriname, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 216: Power Market, Suriname, Installed Capacity Mix (%), 2018

Figure 217: Power Market, Suriname, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 218: Power Market, Suriname, Installed Capacity Mix (%),2018–2030

Figure 219: Power Market, Suriname, Goal Vs. Possible Achievement, 2022 & 2027

Figure 220: Power Market, Turks and Caicos, Electric System

Figure 221: Power Market, Turks and Caicos, Generation Mix (%), 2018

Figure 222: Power Market, Turks and Caicos, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 223: Power Market, Turks and Caicos, Installed Capacity Mix (%), 2018

Figure 224: Power Market, Turks and Caicos, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 225: Power Market, Turks and Caicos, Installed Capacity Mix (%),2018–2030

Figure 226: Power Market, Turks and Caicos, Target Vs. Possible Achievement

Figure 227: Power Market, Trinidad and Tobago, Electric System

Figure 228: Power Market, Trinidad and Tobago, Cumulative Installed Capacity by Type (MW), 2006–2018

Figure 229: Power Market, Trinidad and Tobago, Installed Capacity Mix (%), 2018

Figure 230: Power Market, Trinidad and Tobago, Cumulative Installed Capacity by Type (MW), 2019–2030

Figure 231: Power Market, Trinidad and Tobago, Installed Capacity Mix (%),2018–2030

Figure 232: Power Market, Trinidad and Tobago, Target Vs. Possible Achievement, 2021

    Pricing

Discounts available for multiple report purchases.

reportstore@globaldata.com
+44 (0) 161 359 5813

Join our mailing list

Saved reports