The Secretaría De Comunicaciones Y Transportes (SCT), through a special purpose vehicle (SPV) named Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM), is undertaking the New Mexico City International Airport (NICM) project in Mexico City, Mexico.The SPV, Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM) has been formed by several ministries.The project is being developed on a 4,600ha area of Bordo Poniente zone, a 14km away from the existing international airport. The project involves the construction of terminal buildings, an air traffic control room, hangars, six runways, a commercial area, parking lots, drainage and sanitation systems and related infrastructural facilities.The project is being developed in phases and in public-private-partnership (PPP) basis.Mexican construction companies ICA S.A.B de C.V. and OHL Mexico SAB de CV are competing to win the construction contract of the project.Parsons was appointed as management contractor for the project.eJet International Ltd has been appointed as fuel and other related consultants.Foster + Partners, Fernando Romero Enterprise (FR-EE) and Netherlands Airport Consultants (Naco) were jointly appointed as the design contractors for the project.In January 2015, Netherlands Airport Consultants (Naco), Grupo SACMAG and Grupo TADCO won the tender to design the runways, taxiways, platforms and support buildings for the project.SCT announced that there will be a package of 21 tenders for preliminary works, main infrastructure and commissioning works for the first phase.Coconal Group has been appointed as contractor for leveling and cleaning the land work on the project. Company will have 334 days to complete this work.Consorcio IUYET has been appointed to carry out the geomatics engineering study for runways, aprons, taxiways and buildings.Tenders for the first phase of the project were launched in July 8, 2015. A tender has been launched for the Runway 2, Runway 3, drainage systems and other site works.Consortium of ICA, Operadora CICSA and Grupo OHL, Consortium of Isolux de México, Corsán-Corvium Construcción and Isolux Ingeniería, Consortium of Assignia Infraestructuras, SAPI, PINL and Concretos Asfálticos Pirámide, Operadora CICSA, de Carlos Slim, Constructora y Edificadora GIA + A, Promotora y Desarrolladora Mexicana y La Peninsular Compañía Constructora, Mota-Engil México, ICA Constructora de Infraestructura, Constructora El Cajón, Impulsora de Desarrollo Integral and Jaguar Ingenieros Constructores and Constructora de Proyectos Viales de México have presented bid for the Runway 2, Runway 3, drainage systems and other site works.Coconal and Constructora Cicsa de Carlos Slim won the contract to build Runway 2 and Runway 3 whereas Coconal with Constructora y Pavimentadora Vise S.A. de C.V will build Runway 2 and Cicsa with Gia, Prodemex has selected for Runway 3.Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México has been appointed as supervision contractors for construction of terminal.A tender process is under for the construction of a terminal. GACM has received 16 proposals for the construction of a terminal.The name of the partcipant companies are the following: GIA Construyendo Confianza, Promotora y Desarrolladora Mexicana, Peninsular Compañía Constructora, Avance Builders, CCasa Civil México, Constructora Chufani, Levantina Ingeniería y Construcciones, Alfa Proveedores y Contratistas,Caltia Concesiones and Sociedad Anónima de Obras y Servicios y Copa, Gami Ingeniería e Instalaciones, Transportaciones y Construcciones Tamaulipecos and Inmobiliarios Mexicanos y Transportaciones Internacionales Tamaulipecos, Innovaciones Técnicas, Puentes del Pacífico, Construcciones Urales, Azvi, Calzada Construcciones y Construcciones, Dragados, Isolux de México, Corsan Corviam Construcción, Proc Mina, Rubau México, Construcciones Rubau y Ciacsa, Aldesa Construcciones, Jaguar Ingenieros Constructores y Construcciones Aldesem, Construcciones y Trituraciones , Impulsora del Desarrollo Industrial, Ica Constructora de Infraestructura, Constructora El Cajón, Constructora y Operadora de Infraestructura, Desarrollo y Construcciones, Acciona Infraestructura México and Acciona Infraestructura, Sacyr Méxic, Sacyr Sau, Eoccor, Desarrollo y Construcciones Urbanas, Grupo Constructores Transportieren, Constructora Mas y Petreos, Asfatos, GCP, Sapi, Servicon, Conip Contratistas, Maquinaria and Construcción GBNSA.ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón won the construction contract for the foundation slab.Contract signing ceremony will be held on 13th February 2017.Construction of Lanes 2 and 3 and access roads commenced.Stakeholders Information: Planning Authority: Secretaría de Comunicaciones Y TransportesTerminals Design Contractor/Envelope Design: Foster + Partners, Naco and Fernando Romero Enterprise (FR-EE)Runway and other Design Contract: Naco, Grupo SACMAG and Grupo TADCOManagement Contractor: Parsons, CH2M HILL, Inc., FOA ConsultoresContractor (Excavation & Earthwork Sub-Contractor): Coconal GroupGeotechnical Consultant: Consorcio IUYETConsultant (Fuel and related): eJet International LtdContractor (Construction for Runway 2 and Runway 3): Coconal, Constructora y Pavimentadora Vise S.A. de C.V, Cicsa, Gia and ProdemexSupervision Contractor(Terminal): Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México Contractor (Foundation Slab): ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón

Scope

The project involves the construction of new airport terminals in Mexico City, Mexico.The US$13,000 million project includes the following:1. Construction of terminal buildings2. Construction of six runways3. Construction of hangers3. Construction of a commercial area4. Construction of parking lots5. Construction of drainage and sanitation systems6. Construction of related infrastructural facilities7. Construction of an air traffic control (ATC) build

Key Highlights

The Secretaría De Comunicaciones Y Transportes (SCT), through a special purpose vehicle (SPV) named Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM), is undertaking the New Mexico City International Airport (NICM) project in Mexico City, Mexico.The SPV, Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM) has been formed by several ministries.The project is being developed on a 4,600ha area of Bordo Poniente zone, a 14km away from the existing international airport. The project involves the construction of terminal buildings, an air traffic control room, hangars, six runways, a commercial area, parking lots, drainage and sanitation systems and related infrastructural facilities.The project is being developed in phases and in public-private-partnership (PPP) basis.Mexican construction companies ICA S.A.B de C.V. and OHL Mexico SAB de CV are competing to win the construction contract of the project.Parsons was appointed as management contractor for the project.eJet International Ltd has been appointed as fuel and other related consultants.Foster + Partners, Fernando Romero Enterprise (FR-EE) and Netherlands Airport Consultants (Naco) were jointly appointed as the design contractors for the project.In January 2015, Netherlands Airport Consultants (Naco), Grupo SACMAG and Grupo TADCO won the tender to design the runways, taxiways, platforms and support buildings for the project.SCT announced that there will be a package of 21 tenders for preliminary works, main infrastructure and commissioning works for the first phase.Coconal Group has been appointed as contractor for leveling and cleaning the land work on the project. Company will have 334 days to complete this work.Consorcio IUYET has been appointed to carry out the geomatics engineering study for runways, aprons, taxiways and buildings.Tenders for the first phase of the project were launched in July 8, 2015. A tender has been launched for the Runway 2, Runway 3, drainage systems and other site works.Consortium of ICA, Operadora CICSA and Grupo OHL, Consortium of Isolux de México, Corsán-Corvium Construcción and Isolux Ingeniería, Consortium of Assignia Infraestructuras, SAPI, PINL and Concretos Asfálticos Pirámide, Operadora CICSA, de Carlos Slim, Constructora y Edificadora GIA + A, Promotora y Desarrolladora Mexicana y La Peninsular Compañía Constructora, Mota-Engil México, ICA Constructora de Infraestructura, Constructora El Cajón, Impulsora de Desarrollo Integral and Jaguar Ingenieros Constructores and Constructora de Proyectos Viales de México have presented bid for the Runway 2, Runway 3, drainage systems and other site works.Coconal and Constructora Cicsa de Carlos Slim won the contract to build Runway 2 and Runway 3 whereas Coconal with Constructora y Pavimentadora Vise S.A. de C.V will build Runway 2 and Cicsa with Gia, Prodemex has selected for Runway 3.Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México has been appointed as supervision contractors for construction of terminal.A tender process is under for the construction of a terminal. GACM has received 16 proposals for the construction of a terminal.The name of the partcipant companies are the following: GIA Construyendo Confianza, Promotora y Desarrolladora Mexicana, Peninsular Compañía Constructora, Avance Builders, CCasa Civil México, Constructora Chufani, Levantina Ingeniería y Construcciones, Alfa Proveedores y Contratistas,Caltia Concesiones and Sociedad Anónima de Obras y Servicios y Copa, Gami Ingeniería e Instalaciones, Transportaciones y Construcciones Tamaulipecos and Inmobiliarios Mexicanos y Transportaciones Internacionales Tamaulipecos, Innovaciones Técnicas, Puentes del Pacífico, Construcciones Urales, Azvi, Calzada Construcciones y Construcciones, Dragados, Isolux de México, Corsan Corviam Construcción, Proc Mina, Rubau México, Construcciones Rubau y Ciacsa, Aldesa Construcciones, Jaguar Ingenieros Constructores y Construcciones Aldesem, Construcciones y Trituraciones , Impulsora del Desarrollo Industrial, Ica Constructora de Infraestructura, Constructora El Cajón, Constructora y Operadora de Infraestructura, Desarrollo y Construcciones, Acciona Infraestructura México and Acciona Infraestructura, Sacyr Méxic, Sacyr Sau, Eoccor, Desarrollo y Construcciones Urbanas, Grupo Constructores Transportieren, Constructora Mas y Petreos, Asfatos, GCP, Sapi, Servicon, Conip Contratistas, Maquinaria and Construcción GBNSA.ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón won the construction contract for the foundation slab.Contract signing ceremony will be held on 13th February 2017.Construction of Lanes 2 and 3 and access roads commenced.Stakeholders Information: Planning Authority: Secretaría de Comunicaciones Y TransportesTerminals Design Contractor/Envelope Design: Foster + Partners, Naco and Fernando Romero Enterprise (FR-EE)Runway and other Design Contract: Naco, Grupo SACMAG and Grupo TADCOManagement Contractor: Parsons, CH2M HILL, Inc., FOA ConsultoresContractor (Excavation & Earthwork Sub-Contractor): Coconal GroupGeotechnical Consultant: Consorcio IUYETConsultant (Fuel and related): eJet International LtdContractor (Construction for Runway 2 and Runway 3): Coconal, Constructora y Pavimentadora Vise S.A. de C.V, Cicsa, Gia and ProdemexSupervision Contractor(Terminal): Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México Contractor (Foundation Slab): ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón

Reasons to Buy

The Secretaría De Comunicaciones Y Transportes (SCT), through a special purpose vehicle (SPV) named Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM), is undertaking the New Mexico City International Airport (NICM) project in Mexico City, Mexico.The SPV, Grupo Aeroportuario de la Ciudad de México, S.A. de C.V. (GACM) has been formed by several ministries.The project is being developed on a 4,600ha area of Bordo Poniente zone, a 14km away from the existing international airport. The project involves the construction of terminal buildings, an air traffic control room, hangars, six runways, a commercial area, parking lots, drainage and sanitation systems and related infrastructural facilities.The project is being developed in phases and in public-private-partnership (PPP) basis.Mexican construction companies ICA S.A.B de C.V. and OHL Mexico SAB de CV are competing to win the construction contract of the project.Parsons was appointed as management contractor for the project.eJet International Ltd has been appointed as fuel and other related consultants.Foster + Partners, Fernando Romero Enterprise (FR-EE) and Netherlands Airport Consultants (Naco) were jointly appointed as the design contractors for the project.In January 2015, Netherlands Airport Consultants (Naco), Grupo SACMAG and Grupo TADCO won the tender to design the runways, taxiways, platforms and support buildings for the project.SCT announced that there will be a package of 21 tenders for preliminary works, main infrastructure and commissioning works for the first phase.Coconal Group has been appointed as contractor for leveling and cleaning the land work on the project. Company will have 334 days to complete this work.Consorcio IUYET has been appointed to carry out the geomatics engineering study for runways, aprons, taxiways and buildings.Tenders for the first phase of the project were launched in July 8, 2015. A tender has been launched for the Runway 2, Runway 3, drainage systems and other site works.Consortium of ICA, Operadora CICSA and Grupo OHL, Consortium of Isolux de México, Corsán-Corvium Construcción and Isolux Ingeniería, Consortium of Assignia Infraestructuras, SAPI, PINL and Concretos Asfálticos Pirámide, Operadora CICSA, de Carlos Slim, Constructora y Edificadora GIA + A, Promotora y Desarrolladora Mexicana y La Peninsular Compañía Constructora, Mota-Engil México, ICA Constructora de Infraestructura, Constructora El Cajón, Impulsora de Desarrollo Integral and Jaguar Ingenieros Constructores and Constructora de Proyectos Viales de México have presented bid for the Runway 2, Runway 3, drainage systems and other site works.Coconal and Constructora Cicsa de Carlos Slim won the contract to build Runway 2 and Runway 3 whereas Coconal with Constructora y Pavimentadora Vise S.A. de C.V will build Runway 2 and Cicsa with Gia, Prodemex has selected for Runway 3.Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México has been appointed as supervision contractors for construction of terminal.A tender process is under for the construction of a terminal. GACM has received 16 proposals for the construction of a terminal.The name of the partcipant companies are the following: GIA Construyendo Confianza, Promotora y Desarrolladora Mexicana, Peninsular Compañía Constructora, Avance Builders, CCasa Civil México, Constructora Chufani, Levantina Ingeniería y Construcciones, Alfa Proveedores y Contratistas,Caltia Concesiones and Sociedad Anónima de Obras y Servicios y Copa, Gami Ingeniería e Instalaciones, Transportaciones y Construcciones Tamaulipecos and Inmobiliarios Mexicanos y Transportaciones Internacionales Tamaulipecos, Innovaciones Técnicas, Puentes del Pacífico, Construcciones Urales, Azvi, Calzada Construcciones y Construcciones, Dragados, Isolux de México, Corsan Corviam Construcción, Proc Mina, Rubau México, Construcciones Rubau y Ciacsa, Aldesa Construcciones, Jaguar Ingenieros Constructores y Construcciones Aldesem, Construcciones y Trituraciones , Impulsora del Desarrollo Industrial, Ica Constructora de Infraestructura, Constructora El Cajón, Constructora y Operadora de Infraestructura, Desarrollo y Construcciones, Acciona Infraestructura México and Acciona Infraestructura, Sacyr Méxic, Sacyr Sau, Eoccor, Desarrollo y Construcciones Urbanas, Grupo Constructores Transportieren, Constructora Mas y Petreos, Asfatos, GCP, Sapi, Servicon, Conip Contratistas, Maquinaria and Construcción GBNSA.ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón won the construction contract for the foundation slab.Contract signing ceremony will be held on 13th February 2017.Construction of Lanes 2 and 3 and access roads commenced.Stakeholders Information: Planning Authority: Secretaría de Comunicaciones Y TransportesTerminals Design Contractor/Envelope Design: Foster + Partners, Naco and Fernando Romero Enterprise (FR-EE)Runway and other Design Contract: Naco, Grupo SACMAG and Grupo TADCOManagement Contractor: Parsons, CH2M HILL, Inc., FOA ConsultoresContractor (Excavation & Earthwork Sub-Contractor): Coconal GroupGeotechnical Consultant: Consorcio IUYETConsultant (Fuel and related): eJet International LtdContractor (Construction for Runway 2 and Runway 3): Coconal, Constructora y Pavimentadora Vise S.A. de C.V, Cicsa, Gia and ProdemexSupervision Contractor(Terminal): Cal y Mayor y Asociados, Ingeniería y Economía del Transporte (Ineco), Ingeniería y Economía Transportmex (Inecomex), Aecom Technical Services, Urs Corporation México, Supervisión e Ingeniería de Proyectos (Supering), Ayesa Ingeniería y Arquitectura and Ayesa México Contractor (Foundation Slab): ICA, Impulsora de Desarrollo Integral, Construcciones y Trituraciones, Controladora de operaciones de infraestructura and Constructora el Cajón

Key Players

AECOM; Ayesa Ingenieria y Arquitectura SA; Cal y Mayor y Asociados; Carso Infraestructura y Construccion SA De CV; CH2M HILL Inc; Coconal Group; Construcciones y Trituraciones
SA de CV; Constructora and Edificadora GIA + A
SA de CV; Constructora El Cajon SA De CV; Constructora y Pavimentadora Vise; Controladora de Operaciones de Infraestructura
SA de CV; EJet International Ltd; Felipe Ochoa & Associates; Fernando Romero Enterprise; Foster + Partners Ltd; Grupo Aeroportuario de la Ciudad de Mexico SA De CV; ICA Civil Construction; Impulsora de Desarrollo Integral SA De CV; Ineco; Ingenieria Y Economia Ttransportmex; IUYET Consortium
SA de CV; La Nacional Compania Constructora SA De CV; Netherlands Airport Consultants BV; Parsons Corporation; Prodemex; Sacmag De Mexico SA De CV; Secretary of Communications and Transportation; Supervision e Ingenieria de Proyectos SAS; TADCO Constructora SA De CV

Table of Contents

1.Key Statistics

2.Key Dates

3.Sector

4.Operating metrics

5.Tender Information

6.Scope

7.Description

8.Latest update

9.Background

10.Key Contacts

11.General News, Project News

12.Appendix

List of Tables

N/A

List of Figures

N/A

$75

Can be used by individual purchaser only

$225

Can be shared globally by unlimited users within the purchasing corporation e.g. all employees of a single company

Get in touch to find out about our multi-purchase discounts

reportstore@globaldata.com
Tel +44 (0) 20 7947 2960

Every customer’s requirement is unique. We understand that and can customize the report basis your exact research requirements pertaining to market insights, innovation insights, strategy and planning, and competitive intelligence. You can also avail the option of purchasing stand-alone sections of the report or request for a country specific report.

Still undecided about purchasing this report?

Testimonial

“The GlobalData platform is our go-to tool for intelligence services. GlobalData provides an easy way to access comprehensive intelligence data around multiple sectors, which essentially makes it a one-for-all intelligence platform, for tendering and approaching customers.

GlobalData is very customer orientated, with a high degree of personalised services, which benefits everyday use. The highly detailed project intelligence and forecast reports can be utilised across multiple departments and workflow scopes, from operational to strategic level, and often support strategic decisions. GlobalData Analytics and visualisation solutions has contributed positively when preparing management presentations and strategic papers.”

Business Intelligence & Marketing Manager, SAL Heavy Lift

“COVID-19 has caused significant interference to our business and the COVID-19 intelligence from GlobalData has helped us reach better decisions around strategy. These two highlights have helped enormously to understand the projections into the future concerning our business units, we also utilise the project database to source new projects for Liebherr-Werk to use as an additional source to pitch for new business.”

Market Analyst & Management, Liebherr-Werk

Your daily news has saved me a lot of time and keeps me up-to-date with what is happening in the market, I like that you almost always have a link to the source origin. We also use your market data in our Strategic Business Process to support our business decisions. By having everything in one place on the Intelligence Center it has saved me a lot of time versus looking on different sources, the alert function also helps with this.

Head of Key Accounts, Saab AB

Having used several other market research companies, I find that GlobalData manages to provide that ‘difficult-to-get’ market data that others can’t, as well as very diverse and complete consumer surveys.

Marketing Intelligence Manager, Portugal Foods