The Middle East and North Africa (MENA) power projects market outlook report for projects and investments is a comprehensive country-by-country review of the MENA power sector with in-depth analysis on supply and demand, projected investment levels, the role of the private sector, and the search for alternative energy.
With about $30 billion per year of capital spending on major projects, the power sector is one of the strongest and most reliable providers of business and investment opportunities in the MENA region. But the nature of that investment is changing. In the era of the energy transition, it is no longer enough for governments to simply increase production capacity to meet rising demand. Policymakers are also focused on decarbonizing the economy, and on reducing greenhouse gas emissions (GHG). At the same time, increasingly strained public finances are forcing reforms aimed at reducing the cost of subsidizing energy and reducing waste.
What are the market dynamics of power projects in MENA?
Population growth and industrial expansion are driving rising energy consumption across the MENA region, putting electricity generation capacity among the highest priorities. As a result, the region will continue to see large-scale investments in new generation capacity, as well as transmission and distribution networks.
The biggest transformation is the drive to diversify the region’s energy mix. Faced with a shortage of readily available gas supplies and attracted by the falling cost of technology, nearly all MENA countries are now procuring or planning solar and wind projects. They are also looking at other forms of renewable and alternative energy, from waste-to-energy to nuclear power. Utilities are also investing in digital data technologies such as the internet of things (IoT), blockchain, smart grids, artificial intelligence (AI), and digital twins, in order to improve efficiency and reduce waste.
COVID-19 had a severe impact on the MENA power sector in 2020 and 2021. But as the region recovers from the pandemic, demand has recovered and the outlook for the regional power projects market is incredibly strong.
What is the sector-wise outlook of power projects in MENA?
The key sectors of power projects in MENA are commercial sector, industrial sector, residential sector, transport sector, and others.
In 2020, the residential sector was the largest contributor to total power consumption in the MENA region followed by the industrial sector.
MENA power projects market, by sector
For more sector insights, download a free sample
Which are the leading countries in terms of power projects in MENA?
The key countries of power projects in MENA are Saudi Arabia, Kuwait, Iran, UAE, Iraq, Egypt, Qatar, Algeria, Oman, Bahrain, Jordan, Libya, Syria, Tunisia, Morocco, Lebanon, and Yemen.
While the region’s biggest economies, Saudi Arabia and the UAE, and its biggest populations, Egypt and Iran will continue to account for the biggest share of energy consumption, as well as demand growth, smaller markets such as Iraq, Libya, and Syria will see very high growth in consumption as they recover from years of conflict and instability that have ravaged their economies.
MENA power projects, by key countries
To know more about key countries, download a free sample
Who are the leading clients of power projects in MENA?
The leading clients of power projects in MENA are Rosatom State Corporation Engineering Division, Iraq Ministry of Electricity, Dubai Electricity & Water Authority, Renewable Energy Project Development Office, and Atomic Energy Organization of Iran.
MENA power projects, by leading clients
To know more about leading clients, download a free sample
Who are the leading contractors of power projects in MENA?
The leading contractors of the power projects in the MENA region are MAPNA Group, Larsen & Toubro, General Electric, Sinohydro, and China Machinery Engineering Corporation.
MENA power projects, by leading contractors
To know more about leading contractors, download a free sample
Which are the leading ministries & government agencies of power projects in MENA?
The leading ministries & government agencies of power projects in the MENA region are King Abdullah City for Atomic & Renewable Energy, Societe Algerienne de Production de l’Electricite, Iraq Ministry of Electricity, Renewable Energy Project Development Office, and Dubai Electricity & Water Authority.
MENA power projects, by leading ministries & government agencies
To know more about leading ministries & government agencies, download a free sample
Market report scope
| Key sectors | Commercial Sector, Industrial Sector, Residential Sector, Transport Sector, and Others |
| Key countries | Saudi Arabia, Kuwait, Iran, UAE, Iraq, Egypt, Qatar, Algeria, Oman, Bahrain, Jordan, Libya, Syria, Tunisia, Morocco, Lebanon, and Yemen |
| Key clients | Rosatom State Corporation Engineering Division, Iraq Ministry of Electricity, Dubai Electricity & Water Authority, Renewable Energy Project Development Office, and Atomic Energy Organization of Iran |
| Key contractors | MAPNA Group, Larsen & Toubro, General Electric, Sinohydro, and China Machinery Engineering Corporation |
| Key ministries & government agencies | King Abdullah City for Atomic & Renewable Energy, Societe Algerienne de Production de l’Electricite, Iraq Ministry of Electricity, Renewable Energy Project Development Office, and Dubai Electricity & Water Authority |
Reasons to Buy
- Understand the Middle East and North Africa (MENA) power sector
- Detailed analysis of power project investment plans in 17 MENA markets
- Examines the impact of COVID-19 on the renewable energy sector
- Projects opportunities with client and procurement details
- Assessment of opportunities in Middle East renewables
- Examines sustainable energy strategies in the MENA region
- Analysis of the outlook for MENA renewable energy projects
Table of Contents
Tables
List of Tables
Table 1: Mena, power sector indicators cumulative installed capacity (MW), annual power generation (GWh), and installed renewable capacity (MW) by country; 2020, 2025, and 2030
Table 2: Mena Top 10 power EPC contracts awarded in 2020
Table 3: Mena power contracts, underway or planned, by country ($m)
Table 4: Algeria power sector key facts, 2020
Table 5: Selected Algeria power projects awarded and completed since 2012 by value ($m)
Table 6: Algeria power generation projects under construction by value ($m)
Table 7: Algeria’s 2030 renewables plan
Table 8: Planned or underway renewable power projects in Algeria by value ($m)
Table 9: Algeria power transmission projects under construction ($m)
Table 10: Upcoming power transmission projects by value ($m)
Table 11: Algeria leading contractors by projects under execution ($m)
Table 12: Bahrain power sector key facts, 2020
Table 13: Number of transmission substations, 2014-2018
Table 14: Number of underground cables (km), 2014-2018
Table 15: Selected Bahrain power projects awarded and completed since 2016
Table 16: Major upcoming power generation projects in Bahrain by value ($m)
Table 17: Major renewable energy projects in Bahrain ($m)
Table 18: Bahrain power transmission projects under execution by value ($m)
Table 19: Bahrain power transmission projects in pre-execution phase by value ($m)
Table 20: Bahrain leading active contractors by value ($m)
Table 21: Egypt power sector key facts, 2020
Table 22: Planned merchant IPP renewables projects up to 2022
Table 23: Energy sold from distribution companies by end-use, 2019/2020
Table 24: Main power stations, 2020
Table 25: Installed capacity and production from isolated power plants, 2018/2019-2019/2020
Table 26: Fuel consumption by the power sector, 2018/2019-2019/2020 (Ktoe)
Table 27: Capacity of transformers in Egypt, 2019/2020
Table 28: Total length of transmission lines and cables in Egypt (km), 2017/2018-2019/2020
Table 29: Egypt, power generation projects under execution by value ($m) and capacity (MW)
Table 30: Egypt, planned renewable power generation projects by value ($m)
Table 31: Energy generated from hydropower plants, 2013-2018 (GWh)
Table 32: Egypt, power transmission projects under execution by value ($m)
Table 33: Egypt, planned T&D projects by value ($m)
Table 34: Egypt, leading power sector clients by value ($m)
Table 35: Egypt leading power sector contractors by value ($m)
Table 36: Iran power sector key facts, 2020
Table 37: Iranian electricity consumption (GWh)
Table 38: Iranian electricity consumption (% of total)
Table 39: Transmission lines in Iran (km), 2010/11−2017/18
Table 40: Distribution lines data (2017/18)
Table 41: Iranian transmission substation capacity: MVA (2015/16-2017/18)
Table 42: Iranian T & D losses (GWh), 2015−2020
Table 43: Iranian electricity exports and imports (TWh), 2010/11-2017/18
Table 44: Iran power generation projects under execution by value ($m)
Table 45: Iran power generation projects in pre-execution phase by value ($m)
Table 46: Iran renewable energy capacity by technology* (MW)
Table 47: Companies with renewable and clean power purchase agreements as of 2019 in Iran
Table 48: Iran renewable energy projects under execution by value ($m)
Table 49: Iran renewable energy projects in pre-execution phase by value ($m)
Table 50: Renewables feed-in tariff rates, October 2019
Table 51: Iranian electricity production by fuel type (% of total), 2004−2019
Table 52: Iraq power sector key facts, 2020
Table 53: Forecast of consumption in main grid by type (%), 2018-2030
Table 54: Ministry of Electricity plan (2018-2022) with subsidized fuel
Table 55: Iraq 132kV requirements under the long-term transmission plan, 2015-2030 (base forecast)
Table 56: Overall investment in transmission equipment under the long-term plan, 2015-2030 ($m)
Table 57: Long-term investment, 2015-2030
Table 58: INES recommendations for T&D sector
Table 59: Cumulative transmission capacity and Length of transmission lines in Iraq, 2018-2025
Table 60: Iraq, conventional power generation projects under execution by value ($m)
Table 61: Iraq upcoming conventional power projects by value ($m) and capacity (MW)
Table 62: Upcoming renewable power projects in Iraq ($m)
Table 63: Iraq, existing and planned power transmission projects by net project value ($m)
Table 64: KRG planned power generation (including renewables) projects ($m)
Table 65: Jordan power sector key facts, 2020
Table 66: Significant figures for electricity sector in Jordan
Table 67: Jordan’s renewable energy tariffs
Table 68: Electrical energy consumption in Jordan (GWh)
Table 69: Jordan, number of consumers (thousands), 2017-2019
Table 70: Electrical Losses by Sector Type, 2018-2019
Table 71: Available capacity of generating plants (MW), 2016-2020
Table 72: Jordan’s CEGCO installed capacity by plant
Table 73: SEPCO installed capacity, 2011-2020
Table 74: Electricity sales (GWh), 2016-2020
Table 75: Transmission lines (km), 2016-2020
Table 76: Main substations installed capacity (MVA), 2016-2020
Table 77: Electricity imports (GWh), 2011-2020
Table 78: Peak load for Interconnected System (MW)
Table 79: Electricity demand forecast in the interconnected system
Table 80: Selected Jordan power projects awarded and completed since 2016
Table 81: Upcoming power generation projects by value
Table 82: Jordan, renewable energy projects under construction by value ($m)
Table 83: Jordan, planned renewable power projects by value ($m)
Table 84: Fuel consumption for electricity generation by type of fuel (thousand tons of oil equivalent), 2017-
Table 85: Jordan leading contractors by projects under execution by value ($m)
Table 86: Kuwait power sector key facts, 2020
Table 87: Peak power demand and available capacity, 2015−2030 (MW)
Table 88: Breakdown of additional demand by sector, 2012−2022
Table 89: Existing power plants
Table 90: Kuwait transmission network (ckm), 2020
Table 91: Kuwait distribution network (ckm), 2020
Table 92: Kuwait planned generation capacity additions, 2017-2027 (MW)
Table 93: Kuwait planned generation capacity additions, 2028-2035 (MW)
Table 94: Kuwait planned power generation projects (excluding renewables) by value ($m)
Table 95: Kuwait planned renewable (solar) projects by value ($m)
Table 96: Small-scale solar schemes in Kuwait
Table 97: Major existing T&D contracts by value ($m)
Table 98: Planned T&D contracts
Table 99: Kuwait leading power and renewable clients by value ($m)
Table 100: Lebanon, power sector key facts, 2020
Table 101: Lebanon, power sector governance structure
Table 102: Lebanon, power sector project contract awards under execution by value ($m)
Table 103: Lebanon, project contract awards in the pipeline by value ($m)
Table 104: Lebanon, existing installed and effective generation capacity (MW)
Table 105: Lebanon, planned power generation assets (MW) by MOEW
Table 106: Lebanon, renewable energy targets and potentials (MW)
Table 107: Lebanon, wind power and solar power auctions
Table 108: Lebanon, existing hydropower generation assets (MW)
Table 109: Lebanon, hydropower targets and potential (MW)
Table 110: Libya power and renewables sector key facts, 2020
Table 111: Electricity infrastructure damaged during the 2011 civil war
Table 112: Residential power tariffs
Table 113: Non-residential power tariffs
Table 114: Electricity consumption by sector, 2018
Table 115: Transmission lines (km), 2018
Table 116: 400kV Network plan 2015−2030
Table 117: Substations installed capacity (MVA)
Table 118: Power generation projects under construction by value ($m)
Table 119: Thermal power generation projects in pipeline by value ($m)
Table 120: Transmission projects under execution by value ($m)
Table 121: Libya leading contractors, by value ($m)
Table 122: Morocco power sector key facts, 2020
Table 123: Selected Morocco power projects awarded and completed since 2016
Table 124: Major existing renewable power generation projects in Morocco by value ($m)
Table 125: Major upcoming renewable power generation projects in Morocco by value ($m)
Table 126: Major existing hydropower generation projects in Morocco
Table 127: Major upcoming hydro power generation projects in Morocco
Table 128: Morocco existing power transmission projects by value ($m)
Table 129: Morocco upcoming power transmission projects by value ($m)
Table 130: Morocco leading contractors by value
Table 131: Oman power and renewables sector key facts, 2020
Table 132: Renewable Energy Development Plan – MIS (MW), 2019−2025
Table 133: Total power generation capacity in Oman (MW)
Table 134: MIS non-contracted generating capacity by plant, 2020−2024 (MW)
Table 135: Contracted operational power capacity in the MIS
Table 136: Contracted capacity in Dhofar Power System, (MW), 2020-2025
Table 137: Non-firm contracts, renewable energy, 2020-2025
Table 138: Projected total power generation resources in Duqm (MW)
Table 139: Oman thermal power generation projects planned or underway by value ($m)
Table 140: Oman renewable power projects planned by value ($m)
Table 141: Oman power transmission & distribution projects planned or underway by value ($m)
Table 142: Qatar power and renewables sector key facts, 2020
Table 143: Number of electricity customers, 2016-2020
Table 144: Operating IWPPs/IPPs
Table 145: Future IWPP/IPP tendering schedule
Table 146: Selected major power plant contracts
Table 147: Major transmission projects by Kahramaa, 2005−2018
Table 148: T&D commissioned substation infrastructure, 2016-2020
Table 149: T&D cables laid, 2016-2020
Table 150: Qatar power generation projects underway by value ($m)
Table 151: Qatar renewable power projects planned or underway by value ($m)
Table 152: Qatar transmission project phase 12; packages awarded
Table 153: Qatar transmission project phase 13; packages awarded
Table 154: T&D projects planned or underway in Qatar
Table 155: Qatar leading power sector clients by value of projects under execution ($m)
Table 156: Qatar leading power sector contractors by value of projects under execution ($m)
Table 157: Saudi Arabia power and renewables sector key facts, 2020
Table 158: SEC Privatisation – Functions of new unbundled companies
Table 159: Major active thermal power generation plants in Saudi Arabia*
Table 160: Transmission & distribution infrastructure, 2015−2019
Table 161: Number of transmission substations, 2014-2019
Table 162: Saudi Arabia, major power projects (excluding renewables) under execution by value ($m)
Table 163: Saudi Arabia, major planned power projects (excluding renewables) by value ($m)
Table 164: Repdo renewable energy projects by capacity (MW) and value ($m)
Table 165: Repdo third round projects
Table 166: Saudi Arabia, renewable energy projects ($m) under execution
Table 167: Saudi Arabia, upcoming renewable energy projects ($m)
Table 168: Selected T&D contract awards, 2019-2021*
Table 169: Saudi Arabia upcoming power transmission projects by value ($m)
Table 170: Saudi Arabia leading power sector clients by value ($m)
Table 171: Saudi Arabia leading power sector contractors by value ($m)
Table 172: Syria Syria power sector key facts, 2020
Table 173: Syria power projects awarded and completed by value ($)
Table 174: Syria, Power generation projects (excluding renewables) by value ($m)
Table 175: Syria, Renewable planned power generation projects by value ($m)
Table 176: Tunisia power sector key facts, 2020
Table 177: Electricity sales by economic sector (GWh), 2016-2020
Table 178: Electricity production, 2016-2020 (GWh)
Table 179: STEG customer breakdown, 2016-2020 (number of customers)
Table 180: STEG sales, 2016-2020 (GWh)
Table 181: Selected Tunisia power projects awarded and completed since 2010 by value ($m)
Table 182: Hydropower plants
Table 183: Wind power plants
Table 184: Major renewable energy projects under construction in Tunisia, by value ($m)
Table 185: Major upcoming renewable energy projects in Tunisia, by value ($m)
Table 186: Tunisia existing power transmission projects by value ($m)
Table 187: Tunisia upcoming power transmission projects by value ($m)
Table 188: Tunisia leading contractors by value
Table 189: UAE power sector key facts, 2020
Table 190: UAE, Power generation projects (excluding renewables) under construction ($m)
Table 191: UAE, Upcoming power generation projects (excluding renewables) ($m)
Table 192: UAE, Top T&D projects under construction ($m)
Table 193: UAE, planned T&D projects ($m)
Table 194: UAE, Leading contractors by value ($m)
Table 195: Abu Dhabi power sector key facts, 2020
Table 196: Abu Dhabi selected major power plant contract awards, 2011−2020
Table 197: Abu Dhabi, power generation projects in pipeline by net value and capacity ($m)
Table 198: Abu Dhabi, Growth of principal demand drivers (GW)
Table 199: Dubai power sector key facts, 2020
Table 200: Selected major EPC power projects, 2005−2020
Table 201: Dubai thermal power plants
Table 202: Dubai, power generation projects in pipeline by net value and capacity ($m and MW)
Table 203: Dubai key T&D infrastructure, 2018−2020
Table 204: Etihad WE installed capacity
Table 205: Sewa installed and available generating capacity, 2019 (MW)
Table 206: Northern Emirates, power generation projects planned or underway by net value and capacity ($m and MW)
Table 207:Yemen, Power sector key facts, 2020
Table 208: Yemen, power sector assets damaged in violence (units)
Table 209: Yemen, power sector assets damaged in violence by city ($m)
Table 210: Yemen, Total capacity demand as a percentage of total renewable capacity (per cent)
Table 211: Yemen, Projected annual power consumption (TWh) and capacity demand (MW) until 2050
Table 212: Total rural population that cannot access electricity through the national grid (millions)
Table 213: Yemen, capacity demand for the population that can be grid connected (MW), 2020-2050
Table 214: Yemen power projects awarded and completed since 2010 by value ($m)
Table 215: Yemen, Installed capacity of existing thermal power plants in the PEC system (MW)
Table 216: Yemen, Planned power generation projects by capacity (MW) and value ($m)
Table 217: Yemen, Power generation potential of renewable energy resources (MW)
Graphs
List of Figures
Figure 1: Mena power consumption (TWh), 2015-2030
Figure 2: Power Consumption by Country, GWh, 2020-2030
Figure 3: Power demand growth in Mena countries by growth rate (%)
Figure 4: Demand Bifurcation by Country, GWh, 2020
Figure 5: Projected Demand Bifurcation by Country, GWh, 2025
Figure 6: Mena installed total capacity (MW), 2015ꟷ2030
Figure 7: Mena, cumulative installed capacity by country (MW), 2020, 2025, and 2030
Figure 8: Mena, installed thermal capacity growth by energy source (MW), 2020, 2025, and 2030
Figure 9: Mena, installed renewable capacity by country (MW), 2020, 2025, and 2030
Figure 10: Mena, annual power generation by country (GWh), 2020, 2025, and 2030
Figure 11: The carbon challenge
Figure 12: Carbon dioxide emissions per capita (tonnes), 2019
Figure 13: Carbon emissions by country (million tonnes of carbon dioxide), 2009-2019
Figure 14: GCC solar photovoltaic IPP tariffs, Low bid ‒ LCOE ($cents/kWh)
Figure 15: Mena renewables market in 2020
Figure 16: Renewable energy costs ($/kWh)
Figure 17: Forecasted battery storage dedicated to the power sector by region (GWh)
Figure 18: Mena power sector contract awards ($bn), 2011ꟷ2021*
Figure 19: Mena power contracts by country, stage and value ($m)
Figure 20: Mena top power ministries by projects planned or underway
Figure 21: Mena top power ministries by projects planned or underway
Figure 22: Mena top power clients by contract award value ($m)
Figure 23: Mena top power contractor by contract award value ($m)
Figure 24: Structure of the Algerian electricity market
Figure 25: Algeria power consumption (GWh), 2015-2030
Figure 26: Algeria power consumption by segment (GWh), 2020
Figure 27: Algeria power demand (GWh), 2020-2030
Figure 28: Algeria installed capacity (MW), 2015-2030
Figure 29: Algeria installed capacity by technology (MW), 2020 (%)
Figure 30: Algeria installed total capacity by fuel type (per cent), 2015-2020 (Phase 1)
Figure 31: Algeria installed total capacity by fuel type (per cent), 2021-2030 (Phase 2)
Figure 32: Algeria power generation (GWh), 2015-2030
Figure 33: Algeria’s length of transmission network (km), 2004-2018
Figure 34: Algeria’s length of the distribution network (km), 2010-2018
Figure 35: The Algeria power project contract awards, 2011-2021* ($m)
Figure 36: Algeria power pipeline projects size, by stage ($m)
Figure 37: Algeria power pipeline projects size, by sector ($m)
Figure 38: Algeria’s installed generation capacity by fuel type, 2020 (MW)
Figure 39: Algeria active clients by power contracts under execution ($m)
Figure 40: Bahrain, annual power consumption and projected demand (GWh), 2015-2030
Figure 41: Bahrain peak demand (MW), 2015-2020
Figure 42: Bahrain peak demand growth (per cent), 2015-2020
Figure 43: Bahrain average peak load and system generation availability, 2020
Figure 44: Bahrain total installed capacity by fuel type (MW), 2015-2030
Figure 45: Bahrain, annual power generation capacity (GWh), 2015-2030
Figure 46: Bahrain annual T&D Losses (GWh), 2015-2030
Figure 47: Transmission & distribution contract awards, 2016-2020 ($m)
Figure 48: Bahrain electricity imports and exports (GWh), 2011-2018
Figure 49: The Bahrain power project contract awards, 2011-2021* ($m)
Figure 50: Bahrain power pipeline projects size, by stage ($m)
Figure 51: Bahrain power pipeline projects size, by sector ($m)
Figure 52: Renewable energy contract awards, 2011-2021* ($m)
Figure 53: Bahrain active clients by power contracts under execution ($m)
Figure 54: Structure of the Egyptian electricity sector
Figure 55: Egypt, annual power consumption (GWh), 2015-2020
Figure 56: Egypt electricity consumption by end-user, 2019/2020
Figure 57: Egypt, annual power consumption forecast (GWh), 2021-2030
Figure 58: Installed capacity by technology, 2020 (%)
Figure 59: Peak load and installed capacity, 2008/2009−2019/2020
Figure 60: Egypt as a regional electricity hub
Figure 61: Egypt, power generation project contract awards ($m), 2011‒2021*
Figure 62: Egypt, power generation project contract awards in pipeline ($m)
Figure 63: Iran electricity consumption (GWh), 2015-2030
Figure 64: Iran cumulative installed capacity (MW), 2015-2030
Figure 65: Iran installed power capacity by energy type (TWh), 2019
Figure 66: Iran annual power generation (GWh), 2015-2030
Figure 67: Iran power project contract awards, 2011-2021* ($m)
Figure 68: Iran power pipeline projects size, by stage ($m)
Figure 69: Iran power pipeline projects size, by sector ($m)
Figure 70: Installed cumulative renewable capacity (MW), Iran, 2015-2030
Figure 71: Iran renewable energy installations
Figure 72: Iran nuclear power programme
Figure 73: Biggest clients by work under execution ($m)
Figure 74: Biggest contractors by work under execution ($m)
Figure 75: Forecast peak electricity demand in Iraq, 2016−2030
Figure 76: Iraq power consumption (GWh), 2015−2030
Figure 77: Power consumption by segment (%), 2020
Figure 78: Iraq peak power demand and available power capacity (GW), 2018-2023
Figure 79: Iraq cumulative installed capacity by fuel type (MW), 2015−2030
Figure 80: Iraq electricity generation by fuel type (GWh), 2015−2030
Figure 81: Ministry of Electricity plan (2018-2022) with subsidised fuel
Figure 82: The 2015 Iraq 400kV transmission system under the short-term plan
Figure 83: Load centres, zones and gas locations under the long-term transmission plan,
Figure 84: Iraq power project contract awards, 2011-2021* ($m)
Figure 85: Comparison of LCOE of solar power and electricity from oil and gas ($/MWh),
Figure 86: Biggest power sector clients in Iraq by work under execution ($m)
Figure 87: Biggest power sector contractors in Iraq by work under execution ($m)
Figure 88: Comparison of peak electricity demand and average power generation in Iraqi
Figure 89: Structure of the KRG Electricity Ministry
Figure 90: Kurdistan region location of existing power generating plants
Figure 91: Power demand by sector (%), 2016
Figure 92: Peak power demand and average available capacity (MW), 2004-2017
Figure 93: KRG region revised power demand data, 2011−2020
Figure 94: Jordan, measures to integrate high shares of variable renewables in the power
Figure 95: Jordan electricity sector structure
Figure 96: Spatial distribution of global solar irradiation in kWh/m2 resource maps for Jordan
Figure 97: Spatial distribution of wind irradiation in Jordan
Figure 98: Jordan power consumption (GWh), 2015-2030
Figure 99: Jordan peak load demand (MW), 2010-2020
Figure 100: Jordan power demand forecast (GWh), 2020-2030
Figure 101: Jordan power consumption by sector, 2020 (per cent)
Figure 102: Number of consumers by sector, 2019 (per cent)
Figure 103: Jordan’s installed total capacity (MW), 2015-2030
Figure 104: Jordan’s installed total capacity (MW), 2020
Figure 105: Location of CEGCO power plants in Jordan
Figure 106: Jordan annual power generation (GWh), 2015-2030
Figure 107: Jordan transmission grid system
Figure 108: The Jordan power project contract awards, 2011-2021* ($m)
Figure 109: Jordan power pipeline projects size, by stage ($m)
Figure 110: Jordan power pipeline projects size, by sector ($m)
Figure 111: Jordan’s nuclear energy programme
Figure 112: Jordan nuclear energy strategy main goals
Figure 113: Jordan active clients by power contracts under execution by value ($m)
Figure 114: Annual power consumption (GWh), Kuwait, 2015-2020
Figure 115: Peak power demand, 2010-2020 (MW)
Figure 116: Forecast of annual power consumption (GWh), 2021‒2030
Figure 117: Cumulative installed capacity (MW), Kuwait, 2015-2030
Figure 118: Annual power generation (GWh), Kuwait, 2015-2030
Figure 119: Existing power plants
Figure 120: Kuwait annual T&D Losses (GWh), 2015-2030
Figure 121: Kuwait, power sector project awards ($m), 2011‒2021*
Figure 122: Kuwait, power sector project awards in pipeline ($m)
Figure 123: Solar thermal electricity generating potential in Kuwait
Figure 124: Power sector’s fuel mix (%)
Figure 125: Projected fuel consumption by the power sector, 2010-2030 (billion BTUs a day)
Figure 126: Kuwait leading power and renewables contractors by work under execution ($
Figure 127: Lebanon, Annual power consumption (GWh), 2015-2030
Figure 128: Lebanon, Electricity consumption breakdown by sector (per cent), 2020
Figure 129: Lebanon, Existing and projected power demand against projected available capacity
Figure 130: Lebanon, Cumulative installed generation capacity (MW), 2015-2030
Figure 131: Lebanon, annual power generation (GWh), 2015-2030
Figure 132: Lebanon, Map of the electricity grid
Figure 133: Lebanon, Annual T&D losses (GWh)
Figure 134: Lebanon, project contract awards in pipeline by status, value ($m), and sub-sector
Figure 135: Location of power plants in Lebanon
Figure 136: Lebanon, targeted renewable energy mix (per cent)
Figure 137: Lebanon, targeted installed capacities of specific renewable energy sources
Figure 138: Power map of Libya 2018
Figure 139: Electricity consumption (GWh), Libya, 2015-2030
Figure 140: Peak demand and capacity (MW), 2019
Figure 141: Cumulative Installed capacity (MW), Libya, 2015-2030
Figure 142: Cumulative Installed capacity (MW) by fuel type, Libya, 2020 (%)
Figure 143: Libya annual power generation by fuel type (GWh), 2015-2030
Figure 144: High-voltage transmission network
Figure 145: Libya electricity interconnection network
Figure 146: The Libya power project contract awards, 2011-2021* ($m)
Figure 147: Libya power pipeline projects size, by stage ($m)
Figure 148: Libya global horizontal irradiance
Figure 149: Fuel consumption in electrical sector, 2018 (%)
Figure 150: Morocco target fuel mix (%), 2020
Figure 151: Rural electrification percentage in Morocco, 2011-2020
Figure 152: Morocco annual power consumption (GWh), 2015-2030
Figure 153: Morocco installed generation capacity (MW), 2015-2030
Figure 154: Morocco installed generation capacity (MW), 2020 (%)
Figure 155: Morocco annual power generation (GWh), 2015-2030
Figure 156: Morocco annual T&D Losses (GWh), 2015-30
Figure 157: Transmission & distribution contract awards, 2011-2021* ($m)
Figure 158: Morocco electricity imports and exports (GWh), 2011-2018
Figure 159: The Morocco power project contract awards, 2011-2021* ($m)
Figure 160: Morocco power pipeline projects size, by stage ($m)
Figure 161: Morocco power pipeline projects size, by sector ($m)
Figure 162: Renewable energy power projects, 2011-2021* ($m)
Figure 163: Morocco, selected renewables projects
Figure 164: Solar radiation map of Morocco
Figure 165: Wind map of Morocco
Figure 166: Morocco active clients by power contracts under execution ($m)
Figure 167: Oman new electricity market structure
Figure 168: Oman electricity market structure, MIS
Figure 169: Oman electricity market structure, Dhofar Power System (DPS)
Figure 170: The MIS and Salalah systems
Figure 171: Oman electricity reform milestones
Figure 172: Oman annual power consumption (GWh), 2015-2030
Figure 173: Peak power demand in MIS and Dhofar Power System (MW), 2011−2020
Figure 174: Oman installed total capacity by fuel type (MW), 2015-2030
Figure 175: Oman installed total capacity by fuel type (MW), 2020
Figure 176: Projected peak and average power demand in MIS (MW), 2018−2025
Figure 177: Projected peak and average power demand in Dhofar (MW), 2018-2025
Figure 178: Peak power demand in Ad Duqm (MW), 2018−2025
Figure 179: Peak power demand in Musandam (MW), 2018−2025
Figure 180: Oman power project contract awards, 2011-2021* ($m)
Figure 181: Oman annual power generation by fuel type (GWh), 2015-2030
Figure 182: Oman installed renewable capacity (MW), 2015-2030
Figure 183: Oman annual renewable power generation (GWh), 2015-2030
Figure 184: Global solar radiation average (kWh/m2/d)
Figure 185: Annual direct normal irradiance map of Oman*
Figure 186: Projected gas consumption for MIS (million cubic metres/day), 2018−2025
Figure 187: Projected gas consumption for Dhofar (million cubic metres/day), 2018−2025
Figure 188: Biggest power sector clients in Oman by work under execution ($m)
Figure 189: Biggest power sector contractors in Oman by work under execution ($m)
Figure 190: Electricity consumption (GWh), Qatar, 2015-2030
Figure 191: Qatar power consumption by sector, 2020 (MWh, per cent)
Figure 192: Installed power capacity and peak demand, 2010-2020
Figure 193: Peak demand growth, 2010-2020 (%)
Figure 194: Cumulative Installed capacity (MW), Qatar, 2015−2030
Figure 195: Cumulative Installed capacity by technology (MW), Qatar, 2020
Figure 196: Annual power generation (GWh), Qatar, 2015-2030
Figure 197: Location of Qatar’s power plants
Figure 198: Qatar power project contract awards, 2011-2021* ($m)
Figure 199: Institutional structure of decision-making in the Saudi Arabia energy sector
Figure 200: Saudi Arabia’s electricity industry structure, 2020
Figure 201: Saudi Arabia annual power consumption (GWh), 2015-2020
Figure 202: Saudi Arabia power consumption by sector (per cent), 2020
Figure 203: Saudi Arabia, projected demand of annual power consumption (GWh), 2021-2030
Figure 204: Power peak demand growth, 2010-2019 (%)
Figure 205: Power demand forecast, 2000−2030 (MW)
Figure 206: Saudi Arabia, cumulative installed capacity by energy source (MW), 2015-2020
Figure 207: Saudi Arabia, cumulative installed capacity by energy source (MW), 2021-2030
Figure 208: Saudi Arabia, annual power generation by energy source (GWh), 2015-2020
Figure 209: Saudi Arabia, annual power generation by energy source (GWh), 2021-2030
Figure 210: Saudi Arabia ownership of installed capacity (%), 2019
Figure 211: Increase in transmission capacity, 2014−2019 (MVA)
Figure 212: Per capita consumption (kWh), 2011-2019
Figure 213: Saudi Arabia, Generation sector contract awards ($m); 2011-2021*
Figure 214: NREP 2030 Renewables Target
Figure 215: Available generating capacity by fuel, 2019 (%)
Figure 216: Distribution of power generating units by years of service, 2019
Figure 217: Transmission & Distribution contract awards, 2011−2021* ($m)
Figure 218: Syria Power Sector Structure
Figure 219: Syria, Annual power consumption (GWh), 2015-2030
Figure 220: Syria, Cumulative installed generation capacity (MW), 2015-2030
Figure 221: Syria, Annual power generation (GWh), 2015-2030
Figure 222: Syria annual T&D Losses (GWh), 2015-2030
Figure 223: EULLPST Grid Interconnection Project
Figure 224: EULLPST as part of a larger Middle East Grid Interconnection Project
Figure 225: Syria, Operational power plants
Figure 226: Syria, Share of installed generation capacity by fuel type (MW), 2020
Figure 227: Institutional Organisation of the Tunisian Power Sector
Figure 228: Tunisia annual power consumption (GWh), 2015-2030
Figure 229: Tunisia peak power demand (MW), 2015-2025
Figure 230: Tunisia peak power demand growth (per cent), 2015-2025
Figure 231: Tunisia annual T&D Losses (GWh), 2015-2030
Figure 232: Tunisia installed total capacity by fuel type (MW), 2015-2030
Figure 233: Tunisia installed total capacity by fuel type (MW), 2020
Figure 234: Tunisia annual power generation by fuel type (GWh), 2015-2030
Figure 235: Tunisia electricity imports and exports (GWh), 2011-2017
Figure 236: Tunisia power project contract awards, 2011-2021* ($m)
Figure 237: Tunisia power pipeline projects size, by stage ($m)
Figure 238: Tunisia power pipeline projects size, by sector ($m)
Figure 239: Targeted share of technology in Tunisian Solar Plan by 2030 (MW)
Figure 240: Tunisia active clients by power contracts under execution ($m)
Figure 241: UAE, annual power consumption (GWh), 2015-2030
Figure 242: UAE, demand growth outlook (MW), 2021-2027
Figure 243: UAE, cumulative installed capacity (excluding renewables), MW, 2015-2030
Figure 244: UAE, annual power generation (excluding renewables), GWh, 2015-2030
Figure 245: UAE, power sector (including renewables) contract awards ($m), 2011-2021*
Figure 246: UAE, power sector (including renewables) contract awards in pipeline ($m)
Figure 247: UAE, clean energy targets, 2050
Figure 248: UAE installed renewable capacity (MW), 2015-2030
Figure 249: UAE annual renewable power generation (GWh), 2015-2030
Figure 250: Peak power demand and installed capacity (MW), 2011−2020
Figure 251: Peak power demand growth (percentage), 2011−2020
Figure 252: Abu Dhabi electricity exports at peak time (MW), 2011-2020
Figure 253: Abu Dhabi power consumption by sector, 2019 (Per cent)
Figure 254: Dubai peak power demand and installed capacity, 2011−2020
Figure 255: Etihad WE’s peak power imports from Abu Dhabi (MW), 2011−2020
Figure 256: Sewa peak power demand growth, 2010-2019 (per cent)
Figure 257: Sewa peak power demand, 2011-2019 (MW)
Figure 258: Sewa’s peak power imports from Abu Dhabi, 2011−2020 (MW)
Figure 259: Yemen, Renewable energy targets (per cent)
Figure 260: Yemen, Annual power consumption (GWh), 2015-2030
Figure 261: Yemen, Electricity consumption breakdown by sector (per cent)
Figure 262: Yemen, Projected annual power consumption (TWh) and capacity demand (MW) until 2050
Figure 263: Yemen, Cumulative installed generation capacity (MW), 2015-2030
Figure 264: Yemen, Annual power generation (GWh), 2015-2030
Figure 265: Yemen, Map of electricity grid
Figure 266: Yemen annual T&D Losses (GWh), 2015-2030
Figure 267: EULLPST Grid Interconnection Project
Figure 268: The Yemen power project contract awards, 2011-2021* ($m)












